My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord #161-3rd Ser/2016 Final Fee Schedule
Orono
>
Ordinances
>
Ord #161-3rd Ser/2016 Final Fee Schedule
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2015 2:50:33 PM
Creation date
2/16/2024 10:25:25 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ZONING APPLICATIONS (CONT.) <br />Application Type <br />Fee <br />Applicable <br />Code Section <br />INDUSTRIAL REVENUE BOND APPLICATIONS <br />Minimum Project Valuation: $250,000.00 <br />Application Fee: 0.1% of project valuation <br />($250.00 minimum) plus <br />$5,000.00 deposit for legalladministrative expenses <br />SERVICE RATES, SURCHARGE FOR STAFF EXPENSE IN EXCESS OF APPLICATION FEES Sec. 75-9, Sec. 78-42 <br />Per Fee Schedule set forth below: <br />Professional Time $ 50.00/hour <br />Clerical Time $ 30.00/hour <br />Legal/Engineering Consultants Actual Billed Cost <br />Mileage/Copies/PostagelEtc. Actual Cost <br />AFTER -THE -FACT APPLICATION INVESTIGATION FEES (Resolution 1306) <br />(Applies to all application types including variances, conditional use permits, subdivision, <br />zoning amendments, rip -rap permits, special improvement reviews, grading permits, moving <br />permits, business licenses, kennel licenses, all building permits and all zoning permits.) <br />This permit fee may be waived by staff for resident property owners who have not involved a <br />contractor in their work, have no previous history of work without a permit and where such work <br />does not entail any zoning violations. <br />Whenever any work, use or division of land for which a formal application is required has been <br />commenced without first making such application and receiving City approval therefore, a <br />special investigation of the circumstances shall be made during the application process. <br />Because of the extra administrative costs involved in the special investigation, the minimum <br />application fee for after -the -fact applications shall be twice the fee set forth in the basic <br />fee schedule, whether or not the application is thereafter approved or denied. Payment of an <br />after -the -fact application fee shall not constitute approval or authorization of the work, use, <br />or division of land, and shall not constitute a penalty or a waiver of the right of the City to <br />institute civil or criminal legal actions against the applicant for commencing such work, use <br />or division of land without the required prior approval of the City. <br />After -the -Fact Investigation Fee Amount: <br />Equal to and in addition to <br />the basic fee amount (total <br />fee is twice the basic fee <br />amount). <br />Res. 1306 <br />2016 Fee Schedule -Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.