My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord #148-3rd Ser/Amending 128 2015 Fee Schedule Revising Storm Water and Drainage Trunk Fees
Orono
>
Resolutions, Ordinances, Proclamations
>
Ordinances
>
Ord #148-3rd Ser/Amending 128 2015 Fee Schedule Revising Storm Water and Drainage Trunk Fees
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2015 9:18:31 AM
Creation date
2/16/2024 10:25:24 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Fee Credits. For the two -acre and five -acre zoning districts, a combined reduction of up to 50% of the Base <br />Development Trunk Fee shall be allowed for the percentage of the total development property acreage in one or more of <br />the following categories: <br />acreage of newly -created wetland. <br />acreage of stormwater ponding or similar improvements that provide additional treatment benefits <br />beyond what is required to treat the stormwater runoff from the development site. <br />acreage of conservation easements resulting from Conservation Design process. <br />5. Maximum fee. For the one -acre zoning districts, any lot exceeding I.0 gross acres, including wetland, shall <br />be charged a maximum trunk fee equal to the trunk fee for a 1.0 acre parcel. <br />6. Maximum fee. For the 112 -acre zoning districts, any lot exceeding 0.5 gross acres, including wetland, shall <br />be charged a maximum trunk fee equal to the trunk fee for a 0.5 acre parcel. <br />7. Multi -family and High -Density Single Family Developments. Trunk fee shall be charged on a per -acre basis, <br />except that the following acreages will not be subject to the trunk fee: <br />all wetland acreage up to the delineation line <br />acreage of stormwater ponding or similar improvements that provide additional treatment benefits <br />beyond what is required to treat the stormwater runoff from the development site. <br />- m reage of consmuf ori easements rtzulting f ." C'onsm adun Dcsign process <br />Section 2. Effective date. This ordinance shall be effective upon adoption and publication <br />according to law. <br />ADOPTED this 26th day of May, 2015 on a vote of 5 ayes and 0 nays by the Orono <br />City Council. <br />ATTEST: <br />Tiegs, City Clerk <br />CITY OF ORONO <br />Lili McMillan, Mayor <br />Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.