Laserfiche WebLink
, <br /> ; <br /> ALL SANITARY SEWER AND MUNICIPAL WATER CONNECTION CHARGES (If not previously assessed or if an improvement project is not deemed to be <br /> required in the sole discretion of the City. If an improvement is required,the connection charge may be in addition to any assessment.) <br /> The connection charge for properties wishing to connect to the sewer or water but which are located outside the delineated boundaries of the affected project area shall <br /> be charged the connection fee for the area. Such connections are subject to City Council approval. <br /> CONNECTION TO WATER SYSTEM IN ADJACENT CITY <br /> Fee <br /> Connection to Long Lake Water System $1,900.00 or per current Long Lake Fee Schedule <br /> Connection to Wayzata Water System $2,122.00 or per current Wayzata Fee Schedule <br /> WATER PROJECTS <br /> By District- Project Unit Charge+ Area Or Acreage Front Foot Credit To Area <br /> Char e + Char e <br /> 1967 LW-1 Highway 12/Crystal Bay $5,710.00 $42.40 (1) <br /> Road <br /> 1969 LW-2 Chev Chase $5,710.00 (1 <br /> 1970 LW-1 Navarre Residential $2,820.00 $ 28.25 (1) <br /> 1970 LW-1 Navarre Commercial $4,240.00 $ 42.50 (1) <br /> 1982-1A Navarro $3,020.00 (1) <br /> 1989 Hi hwa 12 $10,480.00/acre 1) <br /> CREDIT TO AREA: <br /> (1)601-37391 Water Operating <br /> 2013 Fee Schedule-Page 1 S <br />