Laserfiche WebLink
/ <br /> requirements of Minn. Stat. § 115.55 and Minnesota Rules, chapter 7080, or <br /> connected to a public sewer. <br /> (6) In all variance requests, zoning and building permit applications or <br /> conditional use requests, the property owner shall address, when determined <br /> as appropriate by the city engineer or city staff, storm water runoff <br /> management,reduction of impervious surfaces, setback increases, <br /> restoration of wetlands, vegetative buffers, sewage treatment and water <br /> supply capabilities, and other conservation-designed actions. <br /> (7) A portion of a conforming lot may be separated from an existing parcel as <br /> long as the remainder of the existing parcel meets the lot size and sewage <br /> treatment requirements of the zoning district for a new lot and the newly <br /> created parcel is combined with an adjacent parcel. <br /> SECTION 2. Effective date. This ordinance shall be effective upon adoption and publication <br /> according to law. <br /> ADOPTED this 8th day of October, 2012 by the Orono City Council. <br /> CITY OF ORONO <br /> �� /�-0-`�� <br /> Lili Tod McMillan, Mayor <br /> ATTEST: <br /> , <br /> �..,�, �. <br /> i.��,.� `�� <br /> Linda S. Vee, City Clerk <br /> Summary Ordinance published in The Pioneer and The Laker newspapers the week of October <br /> 13, 2012. <br /> Page 4 of 4 <br />