My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord #083-3rd ser/Adopting 2011 Fee Schedule
Orono
>
Ordinances
>
Ord #083-3rd ser/Adopting 2011 Fee Schedule
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2015 12:36:52 PM
Creation date
2/16/2024 10:25:17 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CONSTRUCTION PERMITS AND INSPECTION FEES <br /> Applicable <br /> Permit Tvpe Fee Code Section <br /> BUILDING PERMIT Ord.216 <br /> Minimum Fee $25.00 <br /> Normat Fee (per 2008 Building Permit Fee Table Based on Valuation) <br /> Plan Review Fee: <br /> Commercial (per 2008 Building Permit Fee Table Based on Valuation) <br /> Residential 65%of Building Permit Fee <br /> Building Valuation Standard (per Current I.C.B.O.Building <br /> StandardsBuilding Valuation Data) <br /> Retaining Walls $25.00 minimum <br /> NOTE: Retaining walls in 0-75' lakeshore protected zone (per 2008 Building Permit Fee Table Based on Valuation) <br /> -see Cond.Use Permit section of fee schedule. <br /> Application Escrow: Grading,Excavation and Filling $2,000.00 Ord.42,3rd Series <br /> Application Escrow:New Home/Addition/New Structure $2,500.00 minimum Ord.42,3`d Series <br /> *includes Erosion Control per Section 79 <br /> TEMPORARY CERTIFICATE OF OCCUPANCY ESCROW(winter conditions) $10,000 <br /> ZONING CERTIFICATE OF OCCUPANCY WITHOUT BUILDING PERMIT $50.00 <br /> (change in use) <br /> DEMOLITION PERMIT Ord.216 <br /> Principal Structure $75.00 Initial inspection <br /> $25.00 for each requested <br /> or required inspection beyond <br /> initial inspection <br /> Accessory Structure $50.00 Initial inspection <br /> Application and Erosion Control Escrow $2,000.00 <br /> ZONING PERMIT <br /> DOCKS-RESIDENTIAL $30.00 <br /> [Permanent(CUP Required)and Initial Seasonal] <br /> DOCKS-COMMERCIAL $50.00+engineering charges <br /> Application Escrow: Grading,Excavation and Filling $2,000.00 Ord.42,3�d Series <br /> *includes Erosion Control per Section 79 <br /> GRADING,EXCAVATION,FILLING/LAND ALTERATION <br /> 500 cubic yards or less $50.00+engineering charges <br /> 501 +cubic yards $30.00+Conditional Use Permit <br /> NOTE: 501 cubic yards or more requires a Conditional Use Permit <br /> unless approved as part of building permit. <br /> Application Escrow: Grading,Excavation and Filling $2,000.00 Ord.42,3`d Series <br /> *includes Erosion Contro!per Section 79 <br /> 2011 Fee Schedule-Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.