Laserfiche WebLink
b. Drainage patterns clearly shown using arrows depicting direction <br /> of surface water flow; <br /> c. A map showing the stages or limits of grading together with the <br /> existing or proposed finished elevations; <br /> d. Identification of proposed building bench elevations; <br /> e. Submission of preliminary plans or program for water supply, <br /> sewage disposal, drainage and flood control (if applicable); <br /> f. Soil borings, if required by the city engineer; <br /> g. Locations of any wetlands, lakes, streams, or other critical water <br /> resource areas; <br /> h. Appropriate best management practices set forth in this Chapter; <br /> and <br /> i. Other information as required by the City based on specific project <br /> characteristics. <br /> (2) For all �„�.a:..:�:,..,� ,.�a ,. o ,., ,. ra,,,.�..:.., ,.:�.... : _.,�:..,� ,.._a <br /> rii��,,..�.,,,,,.o .,,.�:.,:+:e� . ,:�i : ,.. � �,,,,o� „ f-» + <br /> ....,�,...�,.....,.,�.,�...�.�� ....� <br /> � <br /> �nn ,.,,�.;,. . .,,.a��...�,:,,�,e.,o,.: � ��+ri�+.=��� other sites unless exempt under <br /> Sec.79-6(c) or any et�ie� site if determined appropriate by the City Engineer due <br /> to potential impacts to wetlands, lakes, or sensitive receiving waters. <br /> a. Grading plan. A grading plan shall be provided that clearly <br /> indicates the proposed land disturbance activities. Both existing and <br /> proposed topography shall be shown and have a maximum contour <br /> interval of two (2) feet. Drainage patterns shall be clearly shown using <br /> arrows depicting direction of flow. Other information shall be shown as <br /> required by the City based on specific project characteristics. <br /> b. Phasing plan. A phasing plan shall be provided that clearly <br /> indicates the areas in the order they are to be disturbed and restored. The <br /> phasing plan shall consider minimization of area and duration of exposed <br /> soil and unstable conditions, minimization of the disturbance of natural <br /> soil cover and vegetation, erosion and sediment control measure <br /> installation, weather conditions and the schedule for temporary and <br /> permanent restoration. The area and duration of each phase shall be <br /> indicated on the plan. <br /> c. Pond detail sheet. A pond detail sheet shall be provided for each <br /> proposed storm water pond that shows detailed pond design including <br /> normal water level, high water level, aquatic bench,maintenance bench, <br /> 6 <br />