b. Drainage patterns clearly shown using arrows depicting direction
<br /> of surface water flow;
<br /> c. A map showing the stages or limits of grading together with the
<br /> existing or proposed finished elevations;
<br /> d. Identification of proposed building bench elevations;
<br /> e. Submission of preliminary plans or program for water supply,
<br /> sewage disposal, drainage and flood control (if applicable);
<br /> f. Soil borings, if required by the city engineer;
<br /> g. Locations of any wetlands, lakes, streams, or other critical water
<br /> resource areas;
<br /> h. Appropriate best management practices set forth in this Chapter;
<br /> and
<br /> i. Other information as required by the City based on specific project
<br /> characteristics.
<br /> (2) For all �„�.a:..:�:,..,� ,.�a ,. o ,., ,. ra,,,.�..:.., ,.:�.... : _.,�:..,� ,.._a
<br /> rii��,,..�.,,,,,.o .,,.�:.,:+:e� . ,:�i : ,.. � �,,,,o� „ f-» +
<br /> ....,�,...�,.....,.,�.,�...�.�� ....�
<br /> �
<br /> �nn ,.,,�.;,. . .,,.a��...�,:,,�,e.,o,.: � ��+ri�+.=��� other sites unless exempt under
<br /> Sec.79-6(c) or any et�ie� site if determined appropriate by the City Engineer due
<br /> to potential impacts to wetlands, lakes, or sensitive receiving waters.
<br /> a. Grading plan. A grading plan shall be provided that clearly
<br /> indicates the proposed land disturbance activities. Both existing and
<br /> proposed topography shall be shown and have a maximum contour
<br /> interval of two (2) feet. Drainage patterns shall be clearly shown using
<br /> arrows depicting direction of flow. Other information shall be shown as
<br /> required by the City based on specific project characteristics.
<br /> b. Phasing plan. A phasing plan shall be provided that clearly
<br /> indicates the areas in the order they are to be disturbed and restored. The
<br /> phasing plan shall consider minimization of area and duration of exposed
<br /> soil and unstable conditions, minimization of the disturbance of natural
<br /> soil cover and vegetation, erosion and sediment control measure
<br /> installation, weather conditions and the schedule for temporary and
<br /> permanent restoration. The area and duration of each phase shall be
<br /> indicated on the plan.
<br /> c. Pond detail sheet. A pond detail sheet shall be provided for each
<br /> proposed storm water pond that shows detailed pond design including
<br /> normal water level, high water level, aquatic bench,maintenance bench,
<br /> 6
<br />
|