Laserfiche WebLink
(2) Maintenance is required as follows: <br /> a. When sediment reaches 1/3 the height of the BMP on perimeter <br /> � control devices, sediment must be removed within twenty-four(24) hours <br /> of discovery. <br /> b. If the perimeter control device is not functional it must be repaired <br /> or replaced within twenty-four(24) hours of discovery. <br /> c. Temporary sediment basins shall be maintained when sediment <br /> reaches %z the outlet height or %2 the basin storage volume. Basins must be <br /> drained or sediment removed within seventy-two (72) hours of discovery. <br /> d. Sediment must be removed from paved surfaces within twenty- <br /> four(24) hours of discovery. <br /> (3) Erosion into Streets, Wetlands or Water Bodies. If eroded soils (including <br /> tracked soils from construction activities) enter or appear likely to enter streets, <br /> wetlands, or other water bodies, prevention strategies, cleanup and repair must be <br /> immediate with the appropriate approvals from the DNR, MPCA, or any other <br /> state, federal, or local agencies as necessary. The�� Owner shall provide <br /> all traffic control and flagging required to protect the traveling public during <br /> cleanup operations. <br /> (4) Erosion Off-Site. If erosion breaches the perimeter of the site, the <br /> �a��Owner shall immediately develop a cleanup and restoration plan, obtain <br /> right-of-entry from the adjoining property owner and get appropriate approvals <br /> from all state, federal, and local agencies as necessary. Then implement the <br /> cleanup and restoration plan within forty-eight (48) hours of obtaining the <br /> adjoining property owner's permission and approval from any appropriate state, <br /> federal, and local agencies. <br /> Sec. 79-10. Completion of Work. <br /> Work will be considered complete when all exposed soil areas have undergone final <br /> stabilization, as defined in section 79-5, is constructed to finish grade, and is in conformance <br /> with all permit conditions of approval to the satisfaction of the City. The Owner���-e� <br /> �e��shall notify the City when the land disturbing operations are ready for final <br /> inspection. Final approval shall not be given until all work, including installation of all drainage <br /> facilities and their protective devices, and all erosion control measures, have been completed and <br /> final stabilization has occurred in accordance with this ordinance. <br /> Sec. 79-11. .Emergencv Corrective Action <br /> , . <br /> 11 <br />