SUMMARY OF ORDINANCE NUMBER 66 , THIRD SERIES
<br /> ORDINANCE NO. 66 , THIRD SERIES
<br /> AN ORDINANCE ADOPTING THE 2010 FEE SCHEDULE
<br /> AND REPEALING ORDINANCE NO. 53, THIRD SERIES
<br /> The following is the official summary of Ordinance Number 66 , Third Series approved by the City
<br /> Council of the City of Orono on December 14, 2009.
<br /> The followin sections have chan es, additions and/or deletions:
<br /> DESCRIPTION 2009 FEE 2010 FEE
<br /> "'�'' ' . ;�--� ;=:' a� >
<br /> f� ry°, .4'"�,'^o-� "�:
<br /> .�:w r�-.. ,
<br /> ;N�,n�;..
<br /> `r� - :��; �:z, , ��a,.. �;,.
<br /> VARIANCE
<br /> Application Escrow:Exempt:Sign CUP/Var; �69A:AA 700.00
<br /> Guest ApbGuest House CUP;Plbg in
<br /> Accessory CUP
<br /> SUBDIVISION
<br /> Final Plat Review rr� �HA�AA �00.00
<br /> k� � ` ,s st � •�,•''"viiF�4��i�
<br /> d.- ^u�'�� �,�
<br /> `�.w � . ������:o:�'�n;; • �',�.
<br /> R �'M1 �',a',�qi .a�.4 � .Yp..�- `�.�i_•' e�
<br /> '.�","'x °W�� " .��-3-'ei'�^7.�'��
<br /> BUILDING PERMIT
<br /> Retaining Walls $25.00 minimum(per 2008 Building No fee change
<br /> NOTE: Retaining walls in 0-75' lakeshore Pernut Fee Table Based on Valuation)
<br /> protected zone-see Cond.Use Permit
<br /> section of fee schedule
<br /> Application Escrow: Grading,Excavation
<br /> and Filline
<br /> Application Escrow:New Home/Addition/New
<br /> Struchue $-FiA&AA 2 000
<br /> *includes Erosion Control per Section 79 $2,500.00 $2,500.00 Minimum
<br /> DEMOLITION PERMIT
<br /> Application&Erosion Control Escrow 2 000
<br /> GENERAL PERMIT
<br /> Grading,Excavation,Filling/Land Alteration
<br /> 500 cubic yards or less $50.00(staff permit)+actual $50.00(staff permit)+actual
<br /> engineering fees if required engineering fees if required
<br /> ($100.00 if engineering fee necessary) �W.��.���s�������-� � �
<br /> $25.00 per each inspection over lst Q��.nn., o „w: e,,.;,,„ � e,. ,�.
<br /> 501 +cubic yards $50.00+Conditional Use Permit $50.00+Conditional Use Permit
<br /> Note: 501 cubic yards or more requires a ($100.00 if engineering fee necessary) �W;�n nn.����������
<br /> Condirional Use Pernut unless approved as $25.00 per each inspection over 1 st W��,nn..o..e.,,.�,:„..,.e,,.;,,.,,,,,e_ ,.,�
<br /> part of building pernut.
<br /> Application Escrow:Grading,Excavation ��8 2 000.00
<br /> and Filling
<br /> *includes Erosion Control per Section 79
<br /> Walls—Not Requiring a Buildin Pernut Grading Perxnit Required
<br /> NOTE: Retaining walls in 0-75'lakeshore
<br /> protected zone-see Cond.Use Permit
<br /> secrion of fee schedule
<br /> Page 2 of 4
<br />
|