Laserfiche WebLink
SUMMARY OF ORDINANCE NUMBER 66 , THIRD SERIES <br /> ORDINANCE NO. 66 , THIRD SERIES <br /> AN ORDINANCE ADOPTING THE 2010 FEE SCHEDULE <br /> AND REPEALING ORDINANCE NO. 53, THIRD SERIES <br /> The following is the official summary of Ordinance Number 66 , Third Series approved by the City <br /> Council of the City of Orono on December 14, 2009. <br /> The followin sections have chan es, additions and/or deletions: <br /> DESCRIPTION 2009 FEE 2010 FEE <br /> "'�'' ' . ;�--� ;=:' a� > <br /> f� ry°, .4'"�,'^o-� "�: <br /> .�:w r�-.. , <br /> ;N�,n�;.. <br /> `r� - :��; �:z, , ��a,.. �;,. <br /> VARIANCE <br /> Application Escrow:Exempt:Sign CUP/Var; �69A:AA 700.00 <br /> Guest ApbGuest House CUP;Plbg in <br /> Accessory CUP <br /> SUBDIVISION <br /> Final Plat Review rr� �HA�AA �00.00 <br /> k� � ` ,s st � •�,•''"viiF�4��i� <br /> d.- ^u�'�� �,� <br /> `�.w � . ������:o:�'�n;; • �',�. <br /> R �'M1 �',a',�qi .a�.4 � .Yp..�- `�.�i_•' e� <br /> '.�","'x °W�� " .��-3-'ei'�^7.�'�� <br /> BUILDING PERMIT <br /> Retaining Walls $25.00 minimum(per 2008 Building No fee change <br /> NOTE: Retaining walls in 0-75' lakeshore Pernut Fee Table Based on Valuation) <br /> protected zone-see Cond.Use Permit <br /> section of fee schedule <br /> Application Escrow: Grading,Excavation <br /> and Filline <br /> Application Escrow:New Home/Addition/New <br /> Struchue $-FiA&AA 2 000 <br /> *includes Erosion Control per Section 79 $2,500.00 $2,500.00 Minimum <br /> DEMOLITION PERMIT <br /> Application&Erosion Control Escrow 2 000 <br /> GENERAL PERMIT <br /> Grading,Excavation,Filling/Land Alteration <br /> 500 cubic yards or less $50.00(staff permit)+actual $50.00(staff permit)+actual <br /> engineering fees if required engineering fees if required <br /> ($100.00 if engineering fee necessary) �W.��.���s�������-� � � <br /> $25.00 per each inspection over lst Q��.nn., o „w: e,,.;,,„ � e,. ,�. <br /> 501 +cubic yards $50.00+Conditional Use Permit $50.00+Conditional Use Permit <br /> Note: 501 cubic yards or more requires a ($100.00 if engineering fee necessary) �W;�n nn.���������� <br /> Condirional Use Pernut unless approved as $25.00 per each inspection over 1 st W��,nn..o..e.,,.�,:„..,.e,,.;,,.,,,,,e_ ,.,� <br /> part of building pernut. <br /> Application Escrow:Grading,Excavation ��8 2 000.00 <br /> and Filling <br /> *includes Erosion Control per Section 79 <br /> Walls—Not Requiring a Buildin Pernut Grading Perxnit Required <br /> NOTE: Retaining walls in 0-75'lakeshore <br /> protected zone-see Cond.Use Permit <br /> secrion of fee schedule <br /> Page 2 of 4 <br />