My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord #055-3rd Ser/Adding Chp 79 concerning const. site runoff
Orono
>
Ordinances
>
Ord #055-3rd Ser/Adding Chp 79 concerning const. site runoff
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2015 11:25:30 AM
Creation date
2/16/2024 10:25:12 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
g. Locations of any wetlands, lakes, streams, or other critical water <br /> resource areas; <br /> h. Appropriate best management practices set forth in this Chapter; <br /> and <br /> i. Other information as required by the City based on specific project <br /> characteristics. <br /> (2) For all subdivisions and commercial or industrial sites in which land <br /> disturbance activities will impact 1 (one) or more acres; or fill or excavate over <br /> 100 cubic yards, whichever is more restrictive; or any other site if determined <br /> appropriate by the City Engineer due to potential impacts to wetlands, lakes, or <br /> sensitive receiving waters. <br /> a. Grading plan. A grading plan shall be provided that clearly <br /> indicates the proposed land disturbance activities. Both existing and <br /> proposed topography shall be shown and have a m�imum contour <br /> interval of two (2) feet. Drainage patterns shall be clearly shown using <br /> arrows depicting direction of flow. Other information shall be shown as <br /> required by the City based on specific project characteristics. <br /> b. Phasing plan. A phasing plan shall be provided that cleaxly <br /> indicates the areas in the order they are to be disturbed and restored. The <br /> phasing plan shall consider minimization of area and duration of exposed <br /> soil and unstable conditions, minimization of the disturbance of natural <br /> . soil cover and vegetation, erosion and sediment control measure <br /> installation, weather conditions and the schedule for temporary and <br /> permanent restoration. The area and duration of each phase shall be <br /> indicated on the plan. <br /> c. Pond detail sheet. A pond detail sheet shall be provided for each <br /> proposed storm water pond that shows detailed pond design including <br /> normal water level, high water level, aquatic bench,maintenance bench, <br /> outlet structures, emergency overflow locations and other project specific <br /> data required by the City. <br /> d. Standard detail sheet. A standard detail sheet shall be provided that <br /> consists of applicable construction details for approved erosion and <br /> sediment control measures as developed by the City. Other techniques <br /> may be used upon prior approval by the City with details provided by the <br /> designer. <br /> e. Specifications. Written specifications for land disturbance <br /> activities such as product descriptions, installation and maintenance <br /> procedures required by the applicant to carry out the project in accordance <br /> with this Chapter. <br /> 144922v2 ( <br />
The URL can be used to link to this page
Your browser does not support the video tag.