My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord #042-3rd Ser/Amending code re: escrows/fees/expenses
Orono
>
Ordinances
>
Ord #042-3rd Ser/Amending code re: escrows/fees/expenses
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2015 11:01:21 AM
Creation date
2/16/2024 10:25:11 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTION 4. City of Orono Ordinance No. 40, 3rd Series, the 2008 Fee Schedule, is hereby <br /> amended as follows: <br /> A. Under the heading CONSTRUCTION PERMITS AND INSPECTION FEES <br /> revise subheading BUILDING PERMIT as follows: <br /> Applicable <br /> Permit Tvae Fee Code Section <br /> BUILDING PERMIT Ord.216 <br /> Minimum Fee $25.00 <br /> Normal Fee (per 2008 Building Permit Fee Table Based <br /> on Valuation) <br /> Plan Review Fee <br /> Commercial (per 2008 Building Permit fee Table Based <br /> on Valuation) <br /> Residential 65% of Building Permit Fee <br /> Building Valuation Standard (per Current I.C.B.O. Building Standards/ <br /> Building Valuation Data) <br /> Permit Escrow• <br /> New Home/Addition/New Structure 2 500.00 Sec.75-1- 75-9 <br /> Exempt: Permits not involvine anv anticinated consultant costs <br /> B. Under the heading CONSTRUCTION PERMITS AND INSPECTION FEES, <br /> revise subheading GRADING, EXCAVATION, FILLING, as follows: <br /> Applicable <br /> Permit Tvpe Fee Code Section <br /> GRADING,EXCAVATION,FILLING <br /> 500 cubic yards or less $50.00(staff permit)+actual <br /> engineering fees if required <br /> $25.00 per each inspection over ls`) <br /> Permit Escrow 600.00 Sec.75-1 -75-9 <br /> 501 +cubic yards $50.00+Conditional Use Permit <br /> $25.00 per each inspection over lsr <br /> Permit Escrow 600.00 Sec.75-1 -75-9 <br /> NOTE: 501 cubic yards or more requires a Conditional Use Permit unless approved as part of a building <br /> permit. <br /> Page 5 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.