Laserfiche WebLink
ALL SANITARY SEWER AND MUNICIPAL WATER CONNECTION CHARGES(If not previously assessed or if an improvement pzoject is not deemed to be required in the sole <br /> discretion of the City. If an unprovement is required,the connection charge may be in addition to any assessment.) <br /> The connection charge for properties wishing to connect to the sewer or water but which are located outside the delineated boundaries of the affected project area shall be charged the <br /> connection fee for that area. Such connections are subject to City Council approval. <br /> SEWER PROJECTS <br /> 1997 SEWER <br /> 97-1 North L.L./L.L.C.0 $24,735.00 (6) <br /> 97-2 Bracketts Point $41,190.00 (6) <br /> 97-3 Bay Ridge $21,990.00 (6) <br /> 1998 - 1999 SEWER <br /> 1998 Shoreline/Heritage Sewer $20,775.00 (7) <br /> 99-1 Orono Orchard Sewer $27,382.00 (7) <br /> 99-2 Edgewood Hills Sewer $34,790.00 (7) <br /> 2000 SEWER <br /> 2000-1 Webber Hills $9,020.00 (8) <br /> 2000-2 Fox Ridge $19,900.00 (8) <br /> 2000-3 East Long Lake $15,800.00 (g) <br /> 2000 Little Orchard Way To be determined by Engineer (?) <br /> CREDIT TO AREA: <br /> (1) 602-37691 Sewer Operating (6) 317-37691 1997 Improvements <br /> (2) 406-37691 PIR Fund#7 LS&Forcemain (7) 313-37691 1998-1999 Sewer Improvements <br /> (3) 316-37691 1992 Improve Stubbs Bay (8) 314-37691 2000 Sewer Improvements <br /> 2008 Fee S �le-Page 12 <br />