Laserfiche WebLink
ALL SAiVITARY SEWER AND MUNICIPAL WATER CONNECTION CHARGES(If not previously assessed or if an improvement project is not deemed to be required in <br /> the sole discretion of the City. If an improvement is required,the connection charge may be in addition to any assessment.) <br /> The connection charge for properties wishing to connect to the sewer or water but which are located outside the delineated boundaries of the affected project area shall be <br /> cl�arged the con�ection fee for the area. Such connections are subject to City Council approval. <br /> WATER PROJECTS <br /> By District- Project Unit Charge+ Area Or Acreage Front Foot Credit To Area <br /> Char e+ Char e <br /> 1967 L�V-1 High�vay 12/Crystal Bay $5,330.00 $39.56 (1) <br /> Road <br /> 1969 LW-2 Chev Chase $5,330.00 -- 1 <br /> 1970 LW-1 Navarre Residentiai $2,635.00 $ 26.35 1) <br /> 1970 LW-1 Navarre Commercial $3,960.00 $ 39.62 1 <br /> 1982-1A Navarro $2,815.00 1 <br /> 1989 Hi hwa 12 �9,780/acre 1 <br /> 1999 Navarre VVater Treatment � 435.00 �1) <br /> Plant Rehabilitation* <br /> *1999 Navarre Water Treatment Plant Rehabilitation Connection Charge-Alt properties�vithin the Navarre Municipal Water District(the area served�vith municipal�vater <br /> service via the Navarre Water Treatment Plant)wl�ich were either not assessed or not fully assessed via special assessment for the 1999 Nlvarre Water Treatment Plant <br /> Rehabilitation Project shall pay a connection charge of$390.00 per unit upon connection to the municipal water system. Such charge shali be collected at the time a building <br /> permit is issued for new construction,or at the time a connection permit is issued for existing structures. <br /> CREDIT TO AREA: <br /> (1)GO1-37391 Water Operating <br /> ZOU7 Fee Sche���le Pagc /S <br />