Laserfiche WebLink
ALL SANITARY SEWER AND MUNICIPAL WATER CONNECTION CHARGES(If not previously assessed or if an improvement project is not deemed to be required <br /> in the sole discretion of the City. If an improvement is required,the connection charge may be in addition to any assessment.) _ <br /> The connection charge for properties wishing to connect to the sewer or water but which are located outside the delineated boundaries of the affected project area shall be <br /> charged the connection fee for the area. Such connections are subject to City Council approval. <br /> WATER PROJECTS <br /> By District- Project Unit Charge+ Area Or Acreage Front Foot Credit To Area <br /> Char e+ Char e <br /> 1967 LW-1 Highway 12/Crystal Bay S 4,960.00 $36.85 (1) <br /> Road <br /> 1969 LW-2 Chev Chase $4,960.00 -- 1 <br /> 1970 LW-1 Navarre Residential $2,455.00 $ 24.55 1 <br /> 1970 LW-1 Navarre Commercial $3,690.00 $ 36.90 1 <br /> 1982-1 A Navarrn �2,620.00 1 <br /> 1989 Hi hwa 12 $9,110/acre 1 <br /> 1999 Navarre Water Treatment $ 405.00 (1) <br /> Plant Rehabilitation* <br /> *1999 Navarre Water Treatment Plant Rehabilitation Connection Charge-All properties within the Navarre Municipal Water District(the area served with municipal water <br /> service via the Navarre Water Treatment Plant)which were either not assessed or not fully assessed via special assessment for the 1999 Navarre Water Treatment Plant <br /> Rehabilitation Project shall pay a connection charge of$390.00 per unit upon connection to the municipal water system. Such charge shall be collected at the t(me a building <br /> permit is issued for new construction,or at the time a connection permit is issued for ezisting structures. <br /> CREDIT TO AREA: <br /> (1)601-37391 Water Operating <br /> 2004 Fee Schedule—Page IS <br />