My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord #005-3rd Ser/Adopting 2004 fee schedule
Orono
>
Ordinances
>
Ord #005-3rd Ser/Adopting 2004 fee schedule
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2015 2:46:11 PM
Creation date
2/16/2024 10:25:07 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ALL SANITARY SEWER AND MUNICIPAL WATER CONNECTION CHARGES(If not previously assessed or if an improvement project is not deemed to be required <br /> in the sole discretion of the City. If an improvement is required,the connection charge may be in addition to any assessment.) _ <br /> The connection charge for properties wishing to connect to the sewer or water but which are located outside the delineated boundaries of the affected project area shall be <br /> charged the connection fee for the area. Such connections are subject to City Council approval. <br /> WATER PROJECTS <br /> By District- Project Unit Charge+ Area Or Acreage Front Foot Credit To Area <br /> Char e+ Char e <br /> 1967 LW-1 Highway 12/Crystal Bay S 4,960.00 $36.85 (1) <br /> Road <br /> 1969 LW-2 Chev Chase $4,960.00 -- 1 <br /> 1970 LW-1 Navarre Residential $2,455.00 $ 24.55 1 <br /> 1970 LW-1 Navarre Commercial $3,690.00 $ 36.90 1 <br /> 1982-1 A Navarrn �2,620.00 1 <br /> 1989 Hi hwa 12 $9,110/acre 1 <br /> 1999 Navarre Water Treatment $ 405.00 (1) <br /> Plant Rehabilitation* <br /> *1999 Navarre Water Treatment Plant Rehabilitation Connection Charge-All properties within the Navarre Municipal Water District(the area served with municipal water <br /> service via the Navarre Water Treatment Plant)which were either not assessed or not fully assessed via special assessment for the 1999 Navarre Water Treatment Plant <br /> Rehabilitation Project shall pay a connection charge of$390.00 per unit upon connection to the municipal water system. Such charge shall be collected at the t(me a building <br /> permit is issued for new construction,or at the time a connection permit is issued for ezisting structures. <br /> CREDIT TO AREA: <br /> (1)601-37391 Water Operating <br /> 2004 Fee Schedule—Page IS <br />
The URL can be used to link to this page
Your browser does not support the video tag.