Laserfiche WebLink
ALL SANITARY SEWER AND MUNICIPAL WATER CONNECTION CHARGES(If not previously assessed or if an improvement project is not deemed to be required <br /> in the sole discretion of the City. If an improvement is required,the connection charge may be in addition to any assessment.) <br /> The connection charge for properfies wishing to connect to the sewer or water but which are located outside the dclineated boundaries of the atfected project area shall bc <br /> charged the connection[ee for that area. Such connections are subject to City Council approval. <br /> 1983-1 Hi hwa 12 Orono-Lon Lake-Medina $1,495.00 1 <br /> 1989 Hi hwa 12 $5,510/acre 1 <br /> 1992 Stubbs Bay Sewer <br /> I Stubbs Bay NE/NW-Bayside East $17,170.00 (5) <br /> II Bederwood $26,590.00 (5) <br /> III Bayside North $22,515.00 (5) <br /> IV Oxford $31,780.00 (5) <br /> V Cygnet and Leaf S25,685.00 (5) <br /> 1997 SEWER <br /> 97-1 North L.L./L.L.C.0 $22,370.00 (() <br /> 97-2 Bracketts Point $37,244.00 (() <br /> 97-3 Bay Ridge $19,885.00 (6) <br /> CREDIT TO AREA: <br /> (1) 602-37691 Sewer Operating (6) 311-37691 1997 Improvements <br /> (4) 406-37691 PIR Fund#7 LS&Forcemain ('n 313-37691 1998-1999 Sewer Improvements <br /> (5) 308-37691 1992 Improve Stubbs Bay (8) 314-37691 2000 Sewer Improvements <br /> 2004 Fee Schedule—Page 12 <br />