Laserfiche WebLink
tWIKNT RKNTAL ?8R BOORLT RATE:ed10*2341 AC/MC 50/50 TONPLANT DEL. PLACED27.00* 31.00* 30.00*CITY OP OROHO1992 BID TABULATIONS FOR STREET MATERIALS 0 EQUIPMENT RENTAL ALL QUANTITIES ARE BID IN TONS—EQUIPMENT IS BID PER HOURLY RATE12"CMP 16 GAUGE 15”CMP 16 GAUGE 18"CMP 16 GAUGE 24"CMP 14 GAUGE 24"CMP 16 GAUGE 36"CMP 14 GAUGE 48"CMP 12 GAUGE 60"CMP 10 GAUGEALL PRICES TO BE DELIVEREDAll Steel Products 5.25*6.25*7.90*12.00*9.50*17.00*34.00 62.00H.V. Johnston 6,17 7.60 9.03 14.73 11.89 21.78 40.36 63.10Contech 6.00 6.85 7.90*12.25 10.10 19.40 32.85*60.80* <br />12"15" 18"24"36"48"60- <br />APRON APRON APRON APRON APRON APRON APRON <br />ALL PRICES TO BE DELIVERED <br />All Steel Products 35.00 44.00 54.00 85.00 250.00 550.00 975.00 <br />H.V. Johnston 31.50*39.60*51.30*76.50*225.00*541.80*951.30* <br />Contech 32.75 41.50 53.90 80.25 237.05 549.50 979.50 <br />* DENOTES LOW BID <br />• # <br />V <br />_ _ _ _ _ _M_ _ _ _ _ _ _ _ _ <br />#