Laserfiche WebLink
IIPMENT RENTAL *ER HOURLY RATE50-50 2341 AC/MCTONPLANTDEL.PLACED27.50 31.50 36.50 CITY OF ORONO1993 BID TABULATIONS FOR STREET MATERIALS & EQUIPMENT RENTAL ALL QUANTITIES ARE BID IN TONS - EQUIPMENT IS BID PER HOURLY RATEALL PRICES TO BE DELIVERED 12" CMP 16 GAUGE 15" CMP 16 GAUGE 18" CMP 16 GAUGE 24" CMP 14 GAUGE 24" CMP 16 GAUGE 36" CMP 14 GAUGE 48" CMP 12 GAUGE 60" CMP 10 GAUGEH.V. Johnston 6.17 7.60 9.03 14.73 11.89 21.78 40.36 63.10All Steel Products 5.25 6.25 7.90 12.00 10.00 17.00 34.00 62.00Contech6.25 7.10 8.15 12.50 10.35 19.65 33.00 60.80ALL PRICES TO BE DELIVERED 12"APRON 15"APRON 18"APRON 24"APRON 36"APRON 48"APRON 60"APRONH.V. Johnston 31.50 39.60 51.30 76.50 225.00 541.80 951.30All Steel Products 35.00 44.00 54.00 85.00 250.00 550.00 975.00 <br />1 Contech 32.75 41.50 53.90 80.25 237 05 549.50 979.50 <br />ALL PRICES TO <br />BE DELIVERED <br />12" <br />BAND <br />15" <br />BAND <br />18" <br />BAND <br />24" <br />BAND <br />36" <br />BAND <br />48" <br />BAND <br />60" <br />BAND <br />H.V. Johnston 6.17 7.60 9.03 11.89 21.78 60.54 94.65 <br />All Steel Products 5.25 6.25 7.90 12.00 25.00 68.00 93.00 <br />Contech 6.25 7.10 0010.35 19.65 49.50 91.20