My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 5931
Orono
>
Resolutions, Ordinances, Proclamations
>
Resolutions
>
Reso 0001-7499
>
Reso 5900 - 5999 (January 11,2010 - November 8, 2010)
>
Resolution 5931
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2015 10:26:52 AM
Creation date
10/14/2015 10:26:52 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� O � <br /> � � <br /> O 4 <br /> CITY of ORONO <br /> � � <br /> ti <br /> ti <br /> RESOLUTION OF THE CITY COUNCiL <br /> ��`�kE38���G NO. � 9 3 1 <br /> A. Lot lines platted per preliminary plat survey/drawing by Mark S. Gronberg <br /> dated 02/16/2010 atta.ched hereto as Ezhibit A, except as modified herein. <br /> B. Dedication of"drainage and utility easements" 10' along exterior property <br /> lines and 5' along the interior property line. <br /> D. Dedication of"Drainage Easements"over all drainageways. <br /> E. Naming of plat. <br /> 2. Legal documents required: <br /> A. Title opinion addressed to the City or a title insurance policy in favor of <br /> the City. All owners, mortgage holders or others with property interest <br /> indicated therein shall sign the plat and all other documents affected by <br /> such interest. <br /> B. The applicant must provide certified copies of all recorded easements <br /> currently affecting the property. <br /> E. Signed Developer's Agreement. <br /> F. Letter of Credit for construction of improvements. The City Engineer <br /> shall establish the amount to be provided in the Letter of Credit. <br /> 3. Plat approval fees to be paid: Total due: $33,253.00. <br /> A. Final plat fee= $700.00 <br /> B. Legal review & filing fees for subdivision and associated documents: <br /> $280.00 <br /> C. Park Dedication Fee: $11,100.00 <br /> D. Stormwater and Drainage Trunk Fee: $21,173. <br /> Page 4 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.