Laserfiche WebLink
1S10°26'06"E 73.50S89°51'12"E 76.16N00°08'48"E 70.00 N89°51'12"W 109.0614131211OUTLOT A10R=85.00L=19.58=13°11'55"Checked By:Field Crew:Date Staked:Drawn By:Alliant Job #David Weekley Job #:DAVID WEEKLEY HOMESFOUNDATION AS-BUILT FOR:601720-0101TL12900 Whitewater Drive, Suite 180Minnetonka, MN 55343CE1/16/23733 Marquette Ave, Ste 700Minneapolis, MN 55402612.758.3080 612.758.3099www.alliant-inc.comMAINAlliant Engineering, Inc.FAXLEGAL DESCRIPTIONLots 11, 12, 13, 14, Block 1, ORONO CROSSINGS,Orono, MinnesotaDAVID WEEKLEY HOMES PLAN:B763 - "Brinley"-SLAB ON GRADE-(ELEV A)PLAN DATE: 03/06/2022B764 - "Hall"-SLAB ON GRADE-(ELEV A)PLAN DATE: 03/06/2022ADDRESS:2412, 2408, 2404, 2400, North Blossom CircleLOT AREA:LOT 11 = 2,221 SQ. FT. OR 0.051 ACRESIMPERVIOUS AREA = 1,391 SQ. FT. (62.6%)BUILDING FOOTPRINT AREA = 1,143 SQ. FT.DRIVEWAY = 197 SQ. FT.COVERED PORCH= 17 SQ. FT.SIDEWALK= 18 SQ. FT.AC PAD= 16 SQ. FT.LOT 12 = 1,540 SQ. FT. OR 0.035 ACRESIMPERVIOUS AREA = 1,370 SQ. FT. (89.0%)BUILDING FOOTPRINT AREA = 1,125 SQ. FT.DRIVEWAY = 192 SQ. FT.COVERED PORCH= 19 SQ. FT.SIDEWALK= 18 SQ. FT.AC PAD= 16 SQ. FT.LOT 13 = 1,540 SQ. FT. OR 0.035 ACRESIMPERVIOUS AREA = 1,370 SQ. FT. (89.0%)BUILDING FOOTPRINT AREA = 1,125 SQ. FT.DRIVEWAY = 192 SQ. FT.COVERED PORCH= 19 SQ. FT.SIDEWALK= 18 SQ. FT.AC PAD= 16 SQ. FT.LOT 4 = 1,890 SQ. FT. OR 0.043 ACRESIMPERVIOUS AREA = 1,386 SQ. FT. (73.3%)BUILDING FOOTPRINT AREA = 1,143 SQ. FT.DRIVEWAY = 192 SQ. FT.COVERED PORCH= 17 SQ. FT.SIDEWALK= 18 SQ. FT.AC PAD= 16 SQ. FT.PROPOSED ELEVATIONS:LOTS 11, 12, 13 & 14TOP OF FOUNDATION/SOG = 1024.2GARAGE FLOOR= 1023.8REAR= 1023.5ORONO, MINNESOTALOTS 11, 12, 13 & 14, BLOCK 1I hereby certify that this survey, plan, or report was prepared by me orunder my direct supervision and that I am a duly Licensed LandSurveyor under the laws of the state of Minnesota.______________________________________Print Name______________________________________Signature______________________________________Date License NumberORONO CROSSINGSLEGEND:CSEOFLFETC(P)EXISTING ELEVATIONPROPOSED ELEVATIONDIRECTION OF DRAINAGECURB STOPEMERGENCY OVERFLOWLOWEST POSSIBLE FLOORTOP OF CURBIRON MONUMENT FOUNDELECTRIC BOXTELEPHONE BOXCABLE TV BOXSET CAP IRON MONUMENT 18425WATER VALVESTORM MANHOLESANITARY MANHOLEPROPOSED ELEVATIONPROPOSED CONTOURSEXISTING TREEWETLAND MONUMENTBUILDING PADNOTES:1. SURVEY PREPARED FROM ALLIANTENGINEERING, GRADING PLAN DATEDNOVEMBER 10, 2021.2. BEARINGS ARE ASSUMED PER PLAT.3. BUILDING DIMENSIONS SHOWN AREBASED ON FIRST FLOOR ARCHITECTURALPLANS. ALL DIMENSIONS AND LOCATIONSARE TO BE VERIFIED IN THE FIELD WITHTHE ARCHITECTURAL PLANS.4. ORIGIN BENCHMARK: MNDOT MONUMENT2713 AH, ELEVEATION = 1013.40 (NAVD88).BENCHMARKTOP NUT OF HYDRANT LOCATED NEAR THESOUTHEAST CORNER OF LOT 14, BLOCK 1 HASAN ELEVATION OF 1025.33 FEET.SHEET 1 OF 2AS-BUILT ELEVATIONS:LOTS 11, 12, 13 & 14TOP OF FOUNDATION/SOG = 1024.2GARAGE FLOOR= 1023.5*GARAGE FLOOR TO BE RAISED .30 AFTER FINAL POUR*DANIEL EKREM57366DPE