Laserfiche WebLink
No.Item <br />ItiJ A • 4(K).0(K) Mulct! rolmnn or <br />Hvdroniilnr Water Tower 141.0 feet to <br />High Water Level <br />Furnish and instali a complete elevated <br />water storage tank of the fluted columii <br />or bydxopillar design with 40U.000 <br />gallon capacity within 39 feet of the <br />high water level including: <br />1 Foundation drawings <br />2 I'ank drawings <br />3 Access road <br />4 Piling <br />5 Concrete foutidaliou <br />6 Piping <br />7 Tank fabrication <br />8 Tank erection <br />9 Electrical <br />10 Painting <br />11 Cathodic protection system <br />12 Sitework <br />Total Hid A <br />Hid A - Unit Price <br />13 Foundation piling unit price for <br />difference between design and actual <br />total pile length • VOID; modified <br />by Change Order No. 1 <br />Hid A > Alternate No. I <br />14 I'uruish iV install a 6* x 7* ikiuble <br />A 3T in lieu of specif. 3* X T <br />|)edcstnaa door <br />Uuil <br />Coulracl <br />Ouanliiy <br />Uoil <br />1*1 ice <br />Ouantiiy <br />lo Date <br />3.000.00 :oo% <br />Amounl <br />To Dale <br />IS 1 .-J.aoo.oo iooc:!i 5.100.00 <br />LS I 16.200.00 100%16.200.00 <br />LS 1 18.400.00 100%18.400.00 <br />IJ5 1 58.350.00 100%58.350.00 <br />Ii>1 31.<>00.00 100%31.600.00 <br />lii 1 4.800.00 100%4.800.00 <br />I.S 1 192.000.00 95%182.400.00 <br />LS 1 113.900.00 95%108.205.00 <br />LS 1 73.500.00 40%29.400.00 <br />LS 1 70.‘X)0.00 95%67J55.00 <br />LS 1 4.800.00 <br />IS 1 2J00.00 <br />$592,150.00 $522,110.00 <br />LF 20.00 ADD <br />i.r 3.00 DLDUCT <br />SO^OIJ <br />3.0U0.00 <br />i <br />1 <14 HFP !<l'l