My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-25-1993 Council Packet
Orono
>
City Council
>
1993
>
01-25-1993 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2024 1:19:01 PM
Creation date
2/9/2024 1:15:07 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TO:Mayor and City Council <br />FROM: Ron Moorse, City Administrator <br />DATE:January 21, 1993 <br />SUBJECT: City Facilities Fuel System Cancellation Costs <br />Attachment:A. Initial Listing of Cancellation Costs Related <br />to the Underground Fuel Storage System <br />Dated 10/28/92 <br />B. Updated Listing of Cancellation Costs Dated <br />12/8/9 2 <br />C. Letter From Pump and Meter Service, Inc. Dated <br />12/14/92 Proposing a 50% Reduction In che <br />Cancellation Costs <br />Si?;;:; •“ f -'-■prvic** Inc then proposed to reduce the remaining cancellation <br />cosrby' 50% for a totaf of $2,182. I have advised Pump and Meter <br />Service that the Council approved their above ground tctnk propos <br />on the condition that the cancellation costs be eliminated. <br />Pumo and Meter Service, Inc. has indicated they have a significant <br />amoSn? of tiL and expense invested in the under ground tank <br />nroiect and they need to recover a portion of those costs. <br />Although Pump and Meter has incurred some expenses they also wete <br />auowef to Lbmrt a proposal for an above ground <br />w^^hout having to compete with other vendors. It is difficult to <br />determine whether their profit margin on <br />sufficient to cover the costs incurred on the below ground fuel <br />system. <br />If the city believes the price for the aboveground syscem i® f <br />oL it is reasonable to pay some portion of the <br />However the citv should not pay for costs not directly <br />oTrll.6 costs. A ov«\ta*l co«^!breakdown, and assuming 35% of the nouriy races <br />is as follows: <br />Drafting time 10 hours • $32.50/hour $ <br />Engineering service 0 hours • $65.00/hour ^30!So <br />Permit tees 10.00 <br />AdminiHtrati«^overhead *10 hours • $26.65/hour <br />Material restocking <br />TOTAL $1,715.00 <br />J
The URL can be used to link to this page
Your browser does not support the video tag.