CHANGE ORDER <br />CONSTRUCTION MANAGEMENT EDITION <br />AM DOCUMENT C701/CM <br />Distribution to: <br />OWNER □ <br />ARCHITECT □ <br />CONSTRUCTION MANAGER □ <br />CONTRACTOR □ <br />FIELD □ <br />OTHER □ <br />PROJECT: <br />(name, address) <br />Orono City Hall and <br />Public Works Buildings <br />TO (Contractor): <br />Hoffer's, Inc. <br />8933 Lyndale Avenue South <br />Minneapolis# MN 55420 <br />CHANGE ORDER NUMBER: <br />INITIATION DATE: December 22 , 1992 <br />ARCHITECT'S PROJECT NO: 1124.04 <br />CONSTRUCTION MANAGER'S <br />PROJECT NO: <br />CONTRACT FOR: <br />CONTRACT DATE: <br />4059 <br />Alum. Entry & Store­ <br />front, Glass & Glazing <br />May 11, 1992 <br />You are directed to make the following changes in this Contract: <br />1. Furnish additional labor required to install <br />stainless steel push/pulls as required <br />according to Proposal Request No. 15.Add: $330.00 <br />2, Deduct for deleting breakmetal enclosure <br />according to Field Order No. 8.Deduct: ($165.00) <br />3.Add to contract to furnish a new door for <br />opening ClOO due to rough opening size <br />not being correct.Add: $622.00) <br />Total Net Add: $787.00 <br />Not Viiid until signed by the Owner, the Architect and the Construction Manager <br />Signature of the Contractor indicates agreement herewith, including any adjustment in the Contract Sum or the Corteict Time. <br />78,745.00 <br />(3,463.00) <br />75,282.00. <br />787.00 <br />76,069.00 <br />The original (Contiact Sum) (Guaranteed Maximum Cost) was ............................................... $ <br />Net change by ;areviously authorized Change Orders.......................SI.................................... $ <br />The (Contract Sum) (Guaranteed Maximum Cost) prior to this Change Order was ............... $ <br />The (Contract Sum) (Guaranteed Maximum Cost) will be (increased) (oecreased) (unchanged) <br />by this Change Order............................................................................................................. $ <br />The new (Contract S-rm) (Guaranteed Maximum Cost) including this Change Order will be ... S <br />The Contract Time will be (increased) (decreased) (unchanged) by ( ) Days. <br />The Date of Substantial Completion as of the date of this Change Order therefore is December 31, 1992 . <br />Approved: <br />Boaroian Kroos Pfister and Associates <br />ARCHlTdlT ~ <br />MiJHfeapoli'’- <br />Recommended: <br />Krau.q-Anderson Construction Com; any <br />CONSTRUCTION MANAGER <br />Minnoanolis. MN 55404 _______________ <br />ADORES <br />DATE <br />Agreed To Authorized: <br />Hoffer*s. Inc.City of Orono <br />CONTRACTOR <br />Minneapolis, MN 55420 <br />ADDRESS <br />7 Date <br />OWNER <br />Crystal Bay, MN 55323 <br />ADDRESS <br />DATE <br />CAUTION: Y^u thouid sign an original AIA document which has this caution printed in red. <br />Id^gl An original assures that changes will not be obscured as may occur when documents are reproduced. <br />AU OOCUMtMT CTfl/CM • CMA.sCC 0«0« • CONST«rrTIO*r MANACI m{ST IOITIOH • IUN| lyao IDiriON • AIA* <br />C »*• • THt AMSaiCAN insiiiuti Of AICMITICTS. ir» N|W vo« AW*»UI. NW, WAS min CTO a*. oc. jooo*C701/CM — 19W <br />wsBwmQ: unflcaneeee**ewc^]ms uS eapynfMlaa.an.la aufc**• piaaaiieiaa. <br />i