Laserfiche WebLink
r <br />CHANGE ORDER <br />CONSTRUCTION MANAGEMENT EDITION <br />AIA DOCUMENT C701/CM <br />Distribution to: <br />OWNER □ <br />ARCHITECT □ <br />CONSTRUCTION MANAGER □ <br />CONTRACTOR □ <br />FIELD □ <br />OTHER □ <br />PROJECT: Orono City Hall and <br />(name,address) Public Works Buildings <br />Crystal Bay, 55323 <br />TO (Contractor): <br />CHANCE ORDER NUMBER: Two ( 2 ) <br />INITIATION DATE: December 1, 1992 <br />1124.04ARCHITECT'S PROJECT NO: <br />4059 <br />V <br />Jansco Caulking <br />6200 South ^linwood Dr. N.E. CONSTRUCTION MANAGER'S <br />Wyoming, MN 55092 PROJECT NO: <br />---- --------------------------------------CONTRACT FOR: Caulking/Sealants <br />May 11, 1992CONTRACT DATE: <br />You are directed to make the foilowintj changes in this Contract: <br />1.Furnish additional labor and material <br />necessary to caulk the roof edge per­ <br />imeter as directed by job superintendent.Add: $2,220.00 <br />2.Furnish additional labor and material <br />necessary to caulk control joints and <br />expansion joints in concrete floor of <br />Public Works Building.Add: $2,300.00 <br />Total Add: S4,520.00 <br />Not valid until signed by the Owner, the Architect and the Construction XUnager. <br />Signature of the Contractc' indicates agreement herewith, including any adjusiment m the Contract Sum or the Contract Tirr <br />3.950.00 <br />70.00 * <br />4.020.00 ’^ e <br />The original (Contract Sum) (Cyarawteed h^ax imum CeX) was ..................................................... S <br />Net change by previously authorized Change Orders ...J.1......................................................... $ <br />The (Contract Sum) (Cuaranteed Max imum prior to this Change Order was ................ $ <br />The (Contract Sum) (Cuawnteed Mawnwurw Cost) will be (increased) (deeteesec (unchanged) <br />by this Change Order..................................................................................................................... S <br />The new (Contract Sum) (Cuaranteed Mawimum C<»at) including this Change Order will be ... $ <br />The Contract Time will be (increased) (derraawi) (unchanged) by ( ) Days. <br />TheDateofSubstantialCompletionasof the date of this Change Order therefore is December i, <br />Recommended: <br />4.520.00 <br />8.540.00 <br />CONSTRUCTION MANAGER <br />Mi n.iaanolis. MN 55404 <br />ADORES^v <br />BY DATE <br />Agreed To: <br />.'lAnscT) Caulkina <br />CONTRACTOR <br />Wvomino. MN 55092 <br />a <br />/^/‘Z /r ^ <br />iv DATE <br />Approvea: <br />Boarriian Kreos^J?^■rster and Associates <br />ARCHITECT <br />Mi nn/eapoi^ <br />BY / <br />Aufnorized: <br />"citv of Orono <br />OWNt.R <br />Crystal Bay, MN 55323 <br />ADDRESS <br />DATE <br />nn CAUTION: You should sign srs original AIA document which has this caution prtntad In rtd <br />An original assures that changes will no! be obscured as may occur when documents are reproducad, <br />AIA DOCtUMINT CZtI'CM • CHAMCI 0«0I* • COr«ST*t'CTION MAS a CIMI sT SDIT iOn • (UM 1M0 lOITIO-** • AIA* <br />a ISM * THI AMIRICAN INStlTUTI Or A»CHITICTS, USS MW YO«A AViNtit. N W.. WASHINGTON. 0 C. »«*C701/CM — I9t9 <br />wanNiNO: UnacanMU eOoiocoeytws us. copyrrgm WiD« »<«d la tufc)act M lasal areaaewSan.