My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-25-1993 Council Packet
Orono
>
City Council
>
1993
>
01-25-1993 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2024 1:19:01 PM
Creation date
2/9/2024 1:15:07 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The tables on Page 12-A provides a breakdown of sewered <br />household, population and employment forecasts by major <br />interceptor service area. Lift Station 59 serves all of <br />southwest Orono's commercial and residential development, plus <br />the City of Minnetonka Beach, and is located at the former Orono <br />Sewage Treatment Plant property on Old Crystal Bay Road. Lift <br />Station 60 serves the City of Long Lake plus industrial, <br />commercial. Institutional and residential development in north <br />central Orono. Connections to the interceptor downstream from <br />LS-59 and LS-60 within Orono also listed separately. Finally, <br />connections directly to the City of Wayzata collector system <br />constitute a fourth listing. <br />H. Sewer Facilities Plan <br />Orono's plan for future sewer facilities continues to be <br />consistent with the existing local and metropolitan sewer <br />facilities capacities. Comprehensive Plan Amendment #2 adopted <br />in May of 1988 described the necessary system improvements to <br />accomodate the anticipated commercial and residential growth <br />resulting from that Amendment. <br />The table below and that on Page 13 provide an update of <br />projected development in the City related to sewer system design <br />capacities. <br />ORONO FROJECTEO FLOWS - HCD <br />Year 1990 2000 2010 2020 Saturation Design Caoacity <br />LITT STATICS 59 Re*.0.41 0.45 0.46 0.46 0.51 - <br />Non-Rea.0.04 0.04 0.04 0.04 0.04 - <br />Total 0.45 0.49 0.50 0.50 o.ss 0.89 MGD* <br />LIFT STATION 60 Re*.0.01 0.02 0.04 0.06 0.10 - <br />.Son-Re*.o.os 0.06 o.oa O.OB 0.08 • <br />Total 0.06 O.Of 0.12 0.14 o.ia 1.10 .MCO* <br />downstream 0.03 0.04 0.04 0.04 0.04 - <br />INTERCEPTOR Non-Re*.0.01 0.01 0.01 0.01 0.01 — <br />Total 0.04 o.os o.os 0.05 o.os - <br />HAF2ATA 0ZREC7 R«s.O.Ol 0.01 0.01 0.01 0.01 - <br />Non-Rat.0.01 0.01 0.01 O.OX 0.01 - <br />Total 0.02 O.02 0.02 <br />1 o 1 •1 o 1 110.02 - <br />TOTAL* MCO 0.57 0.64 0.69 0.71 O.iO <br />TOTAL MCY 201 334 252 259 292 414** <br />1 unit • 1 household • 274 CPO <br />•include* c*p*clty for other aninicipelitlee <br />••per If to Comprehenei/e Plan (30iJ onxte M Gsl/%tnlt x 315 days)
The URL can be used to link to this page
Your browser does not support the video tag.