My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-25-1993 Council Packet
Orono
>
City Council
>
1993
>
01-25-1993 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2024 1:19:01 PM
Creation date
2/9/2024 1:15:07 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
286
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
D. The completion of the Maple Plain interceptor <br />in 1984 removed the last of 7 municipal sewage treatment plant <br />discharges into Lake Minnetonka. The City of Orono had <br />originally opposed construction of this interceptor in favor of <br />treatment plant upgrades^ because the excess capacity of the <br />interceptor would be counterproductive to Orono's plans for <br />rural, low density development. As a result of Orono's <br />opposition to the excess capacity, the Maple Plain interceptor <br />was redesigned and constructed at a size which provides no <br />ca ty for use by Orono (M.W.C.C. Project #83-52). <br />C. An upgrade of the Orono/Minnetonka Beach <br />interceptor was completed in 1989, resulting in additional <br />capacity. Prior to this project, peak capacities had been <br />exceeded on a number of occasions, allowing untreated sewage to <br />overflow into Lake Minnetonka (M.W.C.C. Project #85-67). <br />2. Municipal Facilities. <br />The City of Orono continues to operate a municipal system of <br />sewer trunks and laterals in various non-contiguous sections of <br />the City. This non-contiguity results from a number of sewer <br />projects serving pockets of historically dense development. <br />These sections are broken down as follows: <br />A. SOUTHWEST ORONO SYSTEM. This system serves <br />the Navarre business area as well as the majority of Orono's <br />lakf ore residential areas. The original 6 projects were <br />inct.. led from 1964 through 1979. The following additions and <br />upgrades have occured from 1980 to 1992: <br />1. North Shore Drive/Scotch Pine - sewer laterals and lift <br />station - 1980; 12 residential connections. <br />2. North Shore Drive/Highwood - sewer laterals - 1981 - 3 <br />residential connections, plus 3 stubs for future use. <br />3. Navarre Theater Project/Norther n Avenue - sewer <br />laterals connecting to existing lift station - 1982 <br />approximately 35 residential connections - Included lift <br />station #6 bypass. <br />4. Carman Street Project (private) - 1984 - lift station <br />and laterals - 3 residential units.
The URL can be used to link to this page
Your browser does not support the video tag.