My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-12-2024 CC Agenda Packet
Orono
>
City Council
>
2024
>
02-12-2024 CC Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2024 11:24:51 AM
Creation date
2/9/2024 10:49:25 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Item No.: 11 Date: February 12, 2024 <br />Presenter: DJ Goman <br />Presenter: Public Works Superintendent <br />Section:Consent Agenda <br /> <br /> <br />Title: <br />Approve Rehabilitation of Lift Station 28 ( 632 Park Lane) <br /> <br />1.Purpose: <br />The purpose of this action item is to gain approval to proceed with lift station rehabilitation and generator <br />replacement project for Lift Station 28. <br />2.Background: <br />The Sewer Department has developed a maintenance plan for the 46 lift/ grinder stations that are part of the <br />sewer As part of the plan, each station is inspected annually to identify routine maintenance needs. In addition <br />to routine maintenance, the plan also includes the upgrade of two lift stations per year. A lift station upgrade <br />involves replacing discharge piping, pumps, and control panel and all electrical that operates the lift station. <br />The lift stations that are upgraded are selected based on a number of factors: age, maintenance records, issues <br />discovered during the annual inspection and the risks associated with the failure of the lift station. Lift Station <br />28 (632 Park Lane) was reconstructed in 1996, the lift station surpassed its life expectancy. Maintenance costs <br />are increasing due to its age. <br />3.Scope: <br />The scope of work includes the installation of a new control panel, two new pumps, discharge piping and all <br />associated electrical. The project also includes the replacement of the natural gas generator for Lift Station 28 <br />4.Cost: <br />We have solicited quotations for Lift Station 28 upgrades, listed The lowest quote from a qualified contractor <br />was $79,980.00 from Quality Flow Systems Inc. and Kodiak Power Solutions $26,900.00. <br /> <br />Company Company I Model Cost <br />Quality Flow <br />Systems Inc. <br />new control panel, two new pumps, discharge <br />piping and all electrical work $79,980.00 <br />Quality Flow Iowa <br />Inc. <br />new control panel, two new pumps, <br />discharge piping and all electrical work <br />$82,200.00 <br />Kriha Electric, LLC new control panel, two new pumps, discharge <br />piping and all electrical work $85,200.00 <br />Cummins N Power Generator and related items electrical, and gas <br />piping $30,975.00 <br />Kodiak Power <br />Solutions <br />Generator and related items, electrical, and gas <br />piping $26,900.00 <br /> <br />5.Funding: <br />AGENDA ITEM <br /> <br /> <br /> <br /> <br /> <br />80
The URL can be used to link to this page
Your browser does not support the video tag.