Laserfiche WebLink
Item No.: 11 Date: February 12, 2024 <br />Presenter: DJ Goman <br />Presenter: Public Works Superintendent <br />Section:Consent Agenda <br /> <br /> <br />Title: <br />Approve Rehabilitation of Lift Station 28 ( 632 Park Lane) <br /> <br />1.Purpose: <br />The purpose of this action item is to gain approval to proceed with lift station rehabilitation and generator <br />replacement project for Lift Station 28. <br />2.Background: <br />The Sewer Department has developed a maintenance plan for the 46 lift/ grinder stations that are part of the <br />sewer As part of the plan, each station is inspected annually to identify routine maintenance needs. In addition <br />to routine maintenance, the plan also includes the upgrade of two lift stations per year. A lift station upgrade <br />involves replacing discharge piping, pumps, and control panel and all electrical that operates the lift station. <br />The lift stations that are upgraded are selected based on a number of factors: age, maintenance records, issues <br />discovered during the annual inspection and the risks associated with the failure of the lift station. Lift Station <br />28 (632 Park Lane) was reconstructed in 1996, the lift station surpassed its life expectancy. Maintenance costs <br />are increasing due to its age. <br />3.Scope: <br />The scope of work includes the installation of a new control panel, two new pumps, discharge piping and all <br />associated electrical. The project also includes the replacement of the natural gas generator for Lift Station 28 <br />4.Cost: <br />We have solicited quotations for Lift Station 28 upgrades, listed The lowest quote from a qualified contractor <br />was $79,980.00 from Quality Flow Systems Inc. and Kodiak Power Solutions $26,900.00. <br /> <br />Company Company I Model Cost <br />Quality Flow <br />Systems Inc. <br />new control panel, two new pumps, discharge <br />piping and all electrical work $79,980.00 <br />Quality Flow Iowa <br />Inc. <br />new control panel, two new pumps, <br />discharge piping and all electrical work <br />$82,200.00 <br />Kriha Electric, LLC new control panel, two new pumps, discharge <br />piping and all electrical work $85,200.00 <br />Cummins N Power Generator and related items electrical, and gas <br />piping $30,975.00 <br />Kodiak Power <br />Solutions <br />Generator and related items, electrical, and gas <br />piping $26,900.00 <br /> <br />5.Funding: <br />AGENDA ITEM <br /> <br /> <br /> <br /> <br /> <br />80