Laserfiche WebLink
Agreement No. PW 55-08-23 <br />CSAH No. 112; C.P. 2091103 <br />11 ___ <br />necessary items. <br />8.2.2 Locating Traffic Signal Cable. The County will be responsible for performing <br />all underground location of signal equipment, conduit, wiring and related <br />equipment for the purpose of various design and construction projects or other <br />projects which may be required through the Gopher State One Call system, and <br />furnishing all labor, materials, supplies, tools and other necessary items without <br />cost to Orono. <br />8.2.3 Locating Traffic Signal Fiber Optic Lines. The County will be responsible <br />for performing all underground location of fiber optic lines and related <br />equipment for the purpose of various design and construction projects or other <br />projects which may be required through the Gopher State One Call system, and <br />furnishing all labor, materials, supplies, tools and other necessary items without <br />cost to Orono. <br />8.2.4 Traffic Signal Components. The County shall be responsible for maintenance <br />and repair of all traffic signal system components, including cabinets, controller, <br />control equipment, conduit system and interconnect cable, signal poles, mast <br />arms, pushbutton posts, wiring, detection, EVP, signal heads, pedestrian <br />pushbuttons, Pan Tilt and Zoom (PTZ) cameras, and mast-arm mounted street <br />signs. <br />8.2.5 Signal Head Indications. The County shall provide all required maintenance <br />for the signal head indications. Maintenance includes but is not limited to <br />replacement of signal indications for vehicular and pedestrian signal indications. <br />8.2.6 Traffic Signal Interconnect. The County shall be responsible for maintenance <br />and repair of all communication lines (primarily fiber optic lines) between the <br />Signal System, other infrastructure, and County’s traffic management center. <br />8.2.7 Signal Timing and Coordination. The County shall be responsible for signal <br />timing and coordination. Timing and coordination include but are not limited to <br />front page timing, coordination timing, EVP timing, pedestrian timing, and <br />preemption timing. <br />8.2.8 Traffic Signal Component Knockdowns. The County shall be responsible for <br />responding to signal and its component knockdown calls and repairing or <br />replacing associated components damaged as a result of minor or major <br />knockdowns to ensure proper functioning of traffic signals. <br />County Road Pavement Striping. The County shall thereafter maintain and repair all <br />pavement striping for CSAH 112 installed as a part of the Project at the expense of the <br />County. <br />Infiltration Basin. The County will own the Infiltration Basin constructed as a part of <br />the Project and will maintain the Infiltration Basin according to County maintenance <br />practices without any cost or expense to the Cities. Infiltration Basin ownership and <br />274