Laserfiche WebLink
PRELIMINARY ESTIMATE OF CONSTRUCTION COSTS <br />DONATION GARDEN IMPROVEMENTS <br />City of Orono <br />1/30/2024 <br />ITEM NO.ITEM DESCRIPTION UNIT UNIT COST <br />TOTAL ESTIMATED <br />QUANTITY TOTAL ESTIMATED COST <br />1 MOBILIZATION LUMP SUM 8% of total 1 59,200.00$ <br />SITE CONSTRUCTION <br />2 Clearing & Grubbing LUMP SUM $6,000.00 1 6,000.00$ <br />3 Erosion Control LUMP SUM $2,500.00 1 2,500.00$ <br />4 Site Grading & Excavation LUMP SUM $15,000.00 1 15,000.00$ <br />5 Bituminous Parking Lot (including curb and gutter)LUMP SUM $110,000.00 1 110,000.00$ <br />6 Concrete Walk (4")SQ FT $9.00 6500 58,500.00$ <br />MUNICIPAL SERVICES <br />7 Portable Restroom LUMP SUM $3,000.00 1 3,000.00$ <br />8 Garbage Enclosure LUMP SUM $5,000.00 1 5,000.00$ <br />PICKLEBALL COURTS <br />9 Court, fencing,striping and netting (9 courts total in 3 groupings of 3) LUMP SUM $495,000.00 1 495,000.00$ <br />STORMWATER POND AND SITE VEGETATION <br />10 Landscaping (trees, shrubs, perennials and seed)LUMP SUM $20,000.00 1 20,000.00$ <br />11 Stormwater Pond (grading , soil, mulch and plant material) LUMP SUM $25,000.00 1 25,000.00$ <br />799,200.00$ <br />119,880.00$ <br />919,080.00$ <br />*Assumed 2025 construction <br />SUBTOTAL <br />15% CONTINGENCY <br />PRELIMINARY CONSTRUCTION COST* <br />252