Laserfiche WebLink
/ <br />r SLV _ <br />r^:.; '3 <br />ITY ^ <br />DF .* <br />lONC^ <br />City of OROIVO <br />RESOLUTION OF THE CITY COUNCIL <br />NO. _ _ _ _ _ <br />DETERMINING THAT ONE SANITARY SEWER SERVICE WILL <br />BE PROVIDED FOR THE PROPERTY LOCATED AT 1385 FOX <br />STREET, AND DETERMINING STANDARDS FOR AMY FUTURE <br />SUBDIVISION OP THE PROPERTY <br />WHEREAS, the City of Orono is a municipal corporation organized <br />and existing under the laws of the State of Minnesota; and <br />$ <br />WHEREAS, Sewer Project 80-1 has been initiated by the City to <br />solve existing on-site sewage treatment problems in the Minnetonka Bluffs* <br />West Ferndale area, within which the property at 1385 Pox Street, legally <br />described as Government Lot 3 northwest of Great Northern Railroad right- <br />of-way excluding road and the west 33 feet of Lot 3 south of Wayzata <br />and Spring Park Road, is located; cind <br />i^EREAS, the property at 1385 Fox Street has an area of <br />approximately 3.60 acres and contains an existing residential dwelling; <br />and <br />WHEREAS, it is likely that present and/or future on-site sewage <br />treatment problems at 1385 Fox Street can be solved through the use of <br />on-site sewage treatment systems, and therefore the property has been <br />considered for inclusion in the 80-1 project at the o%mer's option;-and <br />WHEREAS,: the owner has indicated a preference that a single <br />sewer service be provided for the existing house with any new lot created <br />by future subdivision to be served by an on-site sewage treatment system, <br />THEREFORE, BE IT RESOLVED, by the City ( uncil of the City of <br />Orono, that one sewer service stub be provided to s e the existing <br />residence located at 1385 Fox Street with the following provisions: <br />1. Any future subdivision of the property must leave not <br />less than one acre for the existing residence. <br />2. Any new building site which might be created will comply <br />with all current zoning regulations at the time of subdivision, <br />the intent of this provisicn being that any new lot created <br />in the future is not intended to be served by the 80-1 sewer <br />project but is intended to fully comply with all City on-site <br />sewage treatment requirements. Therefore there is benefit to <br />the property from the construction of the se«#er to the extent <br />of one unit. <br />PACI I __OF i.