My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-11-1993 Council Packet
Orono
>
City Council
>
1993
>
01-11-1993 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2024 3:48:42 PM
Creation date
2/5/2024 3:45:35 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
250
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CHANGE ORDER <br />CONSTRUCTION MANAGEMENT EDITION <br />AIA DOCUMENT C70UCM <br />Distribution to: <br />OWNER □ <br />ARCHITECT □ <br />CONSTRUCTION MANAGER □ <br />CONTRACTOR □ <br />FIELD □ <br />OTHER □ <br />CHANCE ORDER NUMBER: ^ ^ ^ <br />INITIATION DATE: 0<^tober 22, 1992 <br />1124.04 <br />pnQ r^T. OiTono city snd <br />(name,address) Public Works Buildings <br />Crystal Bay, MM 55323 <br />TO (Contractor): ARCHITECT'S PROJECT NO: <br />^S^^^f^^^^^^^ONSTRUCTION MANAGER'S <br />10255 Inver Grove Trail .rqj ECT NO: <br />Inver Grove Heights, MN 5o07B <br />CONTRACT FOR: Concrete/Masonry <br />CONTRACT DATE: <br />You are directed to make the following changes in this Contract: <br />4059 <br />Add to the contract for items 1 - 41isted <br />on attached sheet.Total Add; $11,974.00 <br />Not valid until signed by the Owner, the Architect «nd the Coniiruction Mansger. <br />Signature ot the Contractor indicates agreement herewith, including any adjustment in the Contract Sum or the Contract Time <br />L <br />342,500.00 . <br />(13,870.75). <br />328,629.25 . <br />The original (Contract SumPfiEaflOHHiiC. MXMiOCIMX was ................................................ $ <br />Net change by previously authorized Change Orders.............#L ........................................... 5 <br />The (Contract Sum) ]g3lMMKQfi{MN»}(SIMKaMK prior to this Change Order was ............... S <br />The (Contract Sum) XOUmWJlIttClttfcKOOWCOBMK will be (increasetK.XdaUiiiJfid)X«iMfiXj0fl) , o . a n <br />by this Change Order........................................................................................................ 5 11,974.00 . <br />The new (Contract JW including this Change Order will be...S 340,603.25. <br />The Contract Time will bc:4ijcjsri^) (unchanged) by ‘ <br />The Date of Substantial Completion as of the date of this Change Order therefore 1$ Decemoer 31, 19 92 <br />Recommended:Approved: <br />Boarman Kcflos Pfister and Associates <br />construction manager <br />Minneaoolis, MN 55404 <br />u- q-qe <br />•V \J DATE <br />Agreed To: <br />Steenberc-Watrud Construction <br />CONTRAaOR , <br />Inve^^rove HiSiyrrfC- MN 55076 <br />// • ^ <br />DATE <br />architect <br />Miwr^ajioli MN 55401 <br />Authonzed: <br />City of Orono <br />^^ystal Bay, MN 55323 <br />address <br />DATE <br />AIA CAUTION: You ahould sign an original AIA document which has this caution printed In red. <br />An original aaauret that changes will not be obscured as may occur when documents are reproduced. <br />AtA OOeVASiWT ClfWCM • CMAMCI 0«0»« • CO*<ST«UCTiON * wIi,I2cTt2i’^'o C* J«S• ISM • thr lUMiaiCAM wsmuTi or aacmiticts , irw mw tOSs *vtNUI, nw, wAiHiNcron. oc.C7*1/CA^ — 1 <br />ifvW aa.eesynsM
The URL can be used to link to this page
Your browser does not support the video tag.