My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-11-1993 Council Packet
Orono
>
City Council
>
1993
>
01-11-1993 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2024 3:48:42 PM
Creation date
2/5/2024 3:45:35 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
250
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
0^ <br />CHANGE ORDER <br />CONSTRUCTION MANAGEMENT EDITION <br />AM DOCUMENT C70UCM <br />Distribution to: <br />OWNER □ <br />ARCHITECT □ <br />CONSTRUCTION MANAGER □ <br />CONTRACTOR □ <br />FIELD □ <br />OTHER □ <br />PROJECT: Orono City Hall and <br />(name,address) Public Works Buildings <br />Crystal Bay, MN 55323 <br />TO (Contractor): <br />Mannstedt and Son, Inc. <br />4801 Nicollet Avenue South <br />Minneapolis, MN 55409 <br />CHANGE ORDER NUMBER: Two (2) <br />INITIATION DATE: November 5, 1992 <br />ARCHITECT'S PROJECT NO: 1124.04 <br />CONSTRUCTION MANAGER'S <br />PROJECT NO: <br />CONTRACT FOR: <br />CONTRACT DATE: <br />You are directed to make the following changes in this Cor t'act: <br />Furnish additional materials as required due <br />to changes in shop drawings as directed per <br />July 17th list. <br />4059 <br />Structural Steel <br />and Metal Fab. <br />May 11, 1992 <br />Add: $793.00 <br />Net valid until ii|nad by tha Owner, the Architect and the Construction Manager. <br />SifTMlurt of the Contractor irtdicatea agreement herewith, including any adjustment m the Contract Sum or the Contract Time. <br />40,460.00 <br />8,540.00 <br />49,000.00 <br />793.00 <br />49,793.00 <br />The original (Contract Sum) was .......................... <br />Net change by previoualy authorized Change Orders..................t r.................... <br />The (Contract prior to this Change Order was <br />The (Contract will be (increased) <br />by thli Change Order.................................................................................................. <br />The new (Contract including this Change Order will be <br />The Contract Time will bd^lUUttttUlXflUEiUUfl) (unchanged) by ( <br />The Date of Substantial Completion as of the date of this Change Order therefore if December 31, 1992 <br />Recommended: Approved: <br />Xraus-Anderson Construction Company Boarj <br />CONSTRUCTION MANAGER <br />Minneapolis, MN 55404 <br />Kroos Pfister and Associates <br />DATE <br />Agreed To: <br />Mann^edt and Son, Inc. <br />Minneapolis, MN 55409 <br />thorized: <br />City of Orono <br />Crystal Bay, MN 55323 <br />TTTT <br />\Cj\w <br />AOORE5S <br />DATE DATI <br />You should aign an original AIA document which haa this caution printed In red. <br />An original etturet that cr>angea will not be obecured •• may occur when documenta ere reproduced. <br />ero*<M • CMAMca oaoia • cowsTtuctiON MANACiMNt umtion . n,ni isaa iottiom • aias <br />• TMf AMatiCAN u,tTiruTi or Aaewners. vjs *i<w vou ww.. waummctom. oc mm <br />ahwatawwi wWWaa US. jaw ana ta wan m w tapt p <br />C701/CM — IfM
The URL can be used to link to this page
Your browser does not support the video tag.