My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-11-1993 Council Packet
Orono
>
City Council
>
1993
>
01-11-1993 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2024 3:48:42 PM
Creation date
2/5/2024 3:45:35 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
250
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
aTO: <br />FROM ; <br />DATE: <br />Mayor and City Council <br />Ron Moorse, City Administrator <br />January 7, 1993 <br />- ; <br />SUBJECT: C'ty Facilities Change Orders <br />■ L <br />Several change orders are attached for Council review and approval. <br />An explanation of each follows: <br />1. Goebel Fixture Company - A deduction of $8,956.00. This cost <br />reduction reflects deletions from the case work as cart of <br />efforts to reduce the facilities budget. <br />2. Twin City Garage Door - Total add of $1,403.00. This is for <br />the furnishing of control units for the public works garage <br />door openers. These were planned as part of the project but <br />were not included in the initial garage door bid documents. <br />3. Hoffer Inc. - This is a total deduct of $3,463.00. This is <br />related to revisions to windows and doors as part of the budget <br />reduction effort. <br />4. Kremer and Davis Inc. - Total add of $400. This is related to <br />5. <br />6 . <br />7 . <br />8 . <br />additional damp proofing provided <br />foundation. <br />to the city offices <br />Mannstedt & Son Inc. - This is a total add of $793.00. This is <br />r<^lated to a number of miscellaneous items that were changed <br />when the shop drawings were completed. <br />LaForce Hardware and Manufacturing - This is a total add of <br />$6,054.00. $4,012 of this amount is related to revisions to <br />doors and frames and hardware to meet codes in the police <br />security area. The remainder is related to providing push and <br />pull handles to the entrance doors to the buildings. <br />Steenburg Watrud Construction - This is a total add of <br />$11,974.00. $3,349 of this amount is related to additional <br />work on footings and foundations to accommodate utilities. The <br />remainder is for revisions to the police security area to meet <br />State requirements. This includes adding footings and changing <br />block work to accommodate the precast ceiling, and adding core <br />fill to the block walls. <br />Vohnoutka Roofing - This is a combination of additions and <br />deductions which totals a net addition of $1, 907.00. There <br />are 2 major additions: <br />1. $4,103 for metal facia in the public works building. The <br />metal facia was deleted when the roof was redesigned as part of <br />the budget reduction effort. However, in the final design this
The URL can be used to link to this page
Your browser does not support the video tag.