Laserfiche WebLink
.4] <br />T- y <br />jar tlie <br />it roof <br />[osed <br />i new <br />I iiiJ.vard <br />:. However, <br />variance <br />)wed <br />future <br />cover and <br />4^ <br />4' <br /><4 <br />¥W <br />j <br />ijSfSr <br />1 <br />f ^ - - <br />ft <br />i <br />ouuciivision i <br />Pg 3 £a;p <br />// <br />Sion >•opo^^^L^ni.h^'Vthe1^ ‘'•bsorption system <br />ti" 3tcop)fot^^Cr| Co.nls- <br />systen,. Serious problems P'-'’* -'PPorJ an on^slLt^ptTc <br />\ <br />/ <br />• >■;*-,- <br />^veloper can assure^oJe'city'tha^an*'?d*'°™"'^*^°" approve tlio proposed nl for each lot platted. and accepf^ble <br />^f^ -------- F^^ijAibes. <br />T_ ^ ^ O A V ^ • <br />Commission recommended tablinp * <br />■O . „v,..a p,„ ■'™>"P«'- •■» .fpor.,.,..^ ------- oj.uauue rne loUowing: cimitjr <br />teal features of the landf sensativity of the pr^ll^e^ topogn,ph- <br />',•. ■ ■■*; •,-Jr''1 <br />■^WT <br />v1 1 <br />h <br />J.;- <br />Colpcppcr Land Cc <br />Sul:)di vision <br />Pg 2 <br />STAFF - October ' <br />rm enclosing a < <br />from tiie Minncha] <br />STAFF - October ! <br />I’m enclosing a < <br />Transportation r< <br />STAFF - October : <br />Engineer will ba <br />STAFF - October <br />Tliis proposal wi <br />scheduled for No <br />not be completed <br />The City has ret <br />(engineering fir <br />finn is now prep <br />Planning Commiss <br />presentation. <br />I have received <br />Conservation Dis <br />copy indicating <br />our corrpTehensi^ <br />Nothing from otl <br />plan :4lng caniss <br />Peviewed soils n <br />that Jim Olson, <br />STAFF - Novenibei <br />Mr. Lilja callei <br />of Bonestroo ani <br />as prepared by < <br />He wanted to lav <br />is Jim Anderson <br />planning cavwis <br />Mr. Neslund, Jr <br />tlie Col pepper L <br />Engineer Jim 01 <br />the proposal, it <br />previously prep