My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-06-1977 Planning Packet
Orono
>
Planning Commission
>
1977
>
09-06-1977 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2024 1:27:33 PM
Creation date
1/24/2024 12:32:30 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
of his <br />each of <br />f to the <br />this new <br />throu^ <br />srty, there <br />5 required <br />LS court <br />;rty and <br />^ CoTimission <br />closed, <br />1 he could <br />ion and <br />ed drawing <br />; r McCOMBS-KNUTSON ASSOCIATES, INC. <br />CONSULTING ENGINEERS ■ LAND SURVEYORS ■ SITE PLANNERS <br />August 29, 1977 <br />gllDVIi <br />AUG SO 197T <br />Barbara Ewald <br />City of Orono <br />P.O. Box 66 <br />Crystal Bay, Minnesota 55323 <br />VILLAGE OE ORONO <br />Subject: Lucian Strong - 1860 Fox Street <br />Preliminary Subdivision <br />Dear Barbara: <br />I have reviewed the subject subdivision application <br />and site. Based on the reviews, I recommend approval <br />of the plat with the resolution of the private easement <br />through Parcel 1825. <br />Very truly yours. <br />c(5mbs-KNUTSON ASSOCIATES, INC <br />Gregory <br />GF: ts <br />Frank, P.E. <br />12805 OLSON MEMORIAL HIGHWAY. MINNEAPOLIS. MINNESOTA 55441 TELEPHONE (612) 559-3700 <br />22 NORTH MAIN STREET. HUTCHINSON. MINNESOTA 65350 TELEPHONE (612) 879-8029 <br />SOUTHWEST ENGINEERING DIVISION. MARSHALL. MINNESOTA 56258 TELEPHONE (507) 532-5820 <br />printed on recycled paper <br />1 i <br />■% <br />/ <br />•• <br />M <br />TO;Plan] <br />FRCM:A. P <br />DATE:Augu: <br />SUBJECT: Nortl <br />On August 4, 19 <br />dredging of a p <br />removal of appn <br />220 feet wide b< <br />site is upland i <br />granted by the 1 <br />STAFF - August <br />Note the enclosi <br />and the m-site <br />STAFF - August <br />Further communic <br />proposed is a d: <br />areas. The dis] <br />reveals little : <br />seawall with Ih <br />rock riprap at ’ <br />with no shorelii <br />PLANNING COM^IIS! <br />Very lengthy di: <br />during work ses* <br />because as per i <br />of the pending i <br />regular meeting <br />" I nail Ilf
The URL can be used to link to this page
Your browser does not support the video tag.