Laserfiche WebLink
November 5, 1993 <br />Jeanne Mabusth <br />City of Orono <br />PO Box 66 <br />Orono, MN 55323 <br />RE: Variance Approval #1842 <br />Dear Ms. Mabusth: <br />Thank you for your time on November 3, 1993 regarding the minor changes on our variance <br />approval. Per the City’s request, the following changes and reasons tor them are addressed. <br />Enclosing of Existing 2nd Story Peck <br />We started this project with a plan, but as we have learned in remodeling, even the well thought- <br />out plans may change. A wall that we were expecting to remove was found to be a load bearing <br />wall. Removing this wall would have turned into a major construction project and considerable <br />expense. <br />With the wall remaining in place and the 4 1/2 / 12 pitch of the roof, this greatly reduced the <br />amount of actual living space we were hoping to gain. The pitch causes a reduction in head <br />room 2’-3’ from each outside wall. <br />As we of>ened everything up we decided that in order to eliminate this h; dj.hip we could raise <br />the ceiling height by changing the pitch of the roof to a 9 / 12. In turn a 30" to cantilever <br />was needed to gain the living space we were kxrking for. <br />This cantilever extends to the south, which meets the DNR requirement of no turther extension <br />to the east or toward the 929.4 water table line. We have also discussed this with our neighbor <br />to the south, and she has no problems with the extension. <br />Other issues: We were told by the window company, Pella, that our existing windows to <br />remain in the room would not be classified as egress if installed today. Also building codes <br />require windows to be at least 18" off the tloor or they must be tempered. The existing <br />w indow s are 6"-8" off the tloor and we considered this change safer, as it is a child’s bedroom. <br />'Hiree Season Porch