My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-08-1993 Council Packet
Orono
>
City Council
>
1993
>
11-08-1993 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2024 1:06:18 PM
Creation date
1/23/2024 1:01:41 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
427
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i. <br />0? <br />\1 <br />% <br />TO;Ron Moorse. City Administrator <br />FROM: John R. Gerhardson, Public Works Director <br />1 <br />DATE:November 4, 1993 \ <br />SUBJECT: Fuel Tank Removal Crystal Bay Site <br />On November 1, 1993 we began rem.oval of the underground fuel tanks at the Cr> stal Bay site. <br />The unleaded gas tank had holes in the bottom and it was determined that there was <br />contaminated soils under the tank. We could not remove the comammated soils because our <br />equipment would not reach to the depth necessary to find the end of the conumination. Further <br />testing of that area is necessary to determine the appropriate method of mitigation. <br />We also experienced approximately 80 cubic yards of contaminated soils around one diesel fuel <br />tank. That material has been transported to the Public Works site where it is being stored until <br />the proper method of cleaning up the contaminated soil is determined. <br />Due to the contaminated soils, eight additional soil samples have been taken for further analysis. <br />I will present further inlbrmation as it becomes available.
The URL can be used to link to this page
Your browser does not support the video tag.