My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-22-2024 CC Agenda Packet
Orono
>
City Council
>
2024
>
01-22-2024 CC Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 11:10:13 AM
Creation date
1/18/2024 5:49:27 PM
Metadata
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
Christine Lusian
Created:
1/19/2024 11:03 AM
Modified:
1/19/2024 11:03 AM
Text:
https://legistarweb-production.s3.amazonaws.com/uploads/attachment/pdf/2390895/Orono_Fire_Station_Site_Plans.pdf
ID:
2
Creator:
Christine Lusian
Created:
1/19/2024 11:03 AM
Modified:
1/19/2024 11:03 AM
Text:
https://legistarweb-production.s3.amazonaws.com/uploads/attachment/pdf/2390896/23-26_Orono_Fire_DD_ARCHITECTURAL_240115.pdf
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Item No.: 11 Date: January 22, 2024 <br />Presenter: Adam Edwards <br />Presenter: City Administrator / Engineer <br />Section:City Administrator/Engineer <br />Report <br /> <br /> <br />Title: Orono Fire facility in Navarre (23-044) Draft Design Review <br /> <br />1.Purpose: <br />The purpose of this item is to draft plans for the Orono Fire Facility in Navarre with the City <br />Council. <br />2.Background: <br /> At the July 24th, 2023 Meeting Council directed staff engage with Oertel Architects to provide <br />architectural services for a design proposal for Orono Fire Facilities. At the August 28th meeting <br />the council approved the contract and authorized the completion of the schematic design phase of <br />the projects. At the November 28th meeting Council authorized the design team to proceed to the <br />design development and construction document phases of the design process. Since then the <br />design team has been focusing on the provision of a 2-bay building adjacent to he existing Navarre <br />Fire station. <br />3.Process: <br />The proposed Time Line is as follows. <br />A. January 30th : Solicit Bids <br />B. February 20th : Open Bids <br />C. February 26th : Award <br />D. March - April: Complete Permitting <br />E. May-July: Construction <br />4.Staff Recommendation: <br />I recommend council provide any comments on the facility. <br />AGENDA ITEM <br /> <br /> <br /> <br /> <br /> <br />COUNCIL ACTION REQUESTED <br />Provide any comments on the draft fire facility plans. <br />Exhibits <br />Exhibit A Orono Fire Station Site Plans <br />Exhibit B Orono Fire Station Architectural Plans <br />226
The URL can be used to link to this page
Your browser does not support the video tag.