My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-18-1986 Planning Packet
Orono
>
Planning Commission
>
1986
>
08-18-1986 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2024 10:02:59 AM
Creation date
1/18/2024 9:57:36 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
S-1 <br />NORTHWESTERN INDUSIRK-.L HHKh. <br />NEW RICHLAND, MN. ‘o6<.>72 <br />PHONE (507) 465-31 ’ I <br />PRIMARY HEAT METHOD: TETCO BACKUP HEAT METHOD: NAT GAS <br />CUSTOMER NAME:ULRICH RESIDENCE <br />HT LOSS <br />DELTA 7 <br />LOSS/HR <br />TETCCI <br />OUTPUT <br />19500 <br />82 <br />237 <br />37400 <br />TETCO <br />h.W <br />BACKUP <br />UNIT <br />OUTPUT <br />3. 3 <br />ELEC <br />COST t . O <br />100000 <br />BACKUP <br />EPF (7.)70 <br />DUAL FUEL <br />KWH CSl <br />BACKUP <br />UNIT <br />COST <br />OUTDR BTU/HR <br />TEMP LOSS <br />OUTDR BTU/HR <br />TEMP LOSS <br />BELOW <br />65 DEG <br />TETCO SEASON <br />RUN HEAT <br />TIME HOURS <br />SEASON <br />TETCO <br />INPUT <br />(KWH) <br />BACKUP <br />INPUT <br />(BTU) <br />BACKUP SEASON <br />INPUT BACKUP <br />(UNIT INPUT <br />(UNITS) <br />62 237 3 711 .01901 735 46.110 0 0 0 <br />57 237 a 1896 .05070 609 101.88 0 0 0 <br />52 237 13 3001 .08238 522 141.91 0 0 <br />0 <br />47 237 18 4266 .11406 468 176.16 0 0 c> <br />42 237 23 5451 .14575 504 242.41 0 0 0 <br />37 237 28 6636 .17743 623 364.78 0 0 0 <br />32 237 33 7821 .20912 666 459.60 0 0 0 <br />27 237 38 9006 .24000 598 475.20 0 0 0 <br />22 237 43 10191 .27249 526 472.98 0 0 0 <br />-17 237 48 11376 .30417 357 358.34 0 0 <br />J^2 237 53 12561 .33586 288 319.20 0 0 0 <br />7 237 58 13746 .36754 219 265.62 0 0 0 <br />2 237 63 14931 .39922 177 233.19 0 «:>c» <br />■“3 237 68 16116 .43091 124 176.33 0 0 0 <br />-0 237 73 17301 .46259 72 109.91 0 0 0 <br />-13 237 78 18486 .49428 46 75.031 0 0 0 <br />1CD237 83 19671 .52596 50 86.784 0 0 0 <br />-23 237 88 20856 .55765 8 14.722 0 0 0 <br />-28 237 93 22041 .58933 3 5.8344 0 0 0 <br />TOTALS 4126.0 0 <br />DUAL FUEL <br />•NON DUAL FUEL <br />•TETCO ” OP COST 124.19 • • - • •TETCO 1□P COST 206^30 ■ '•• • • •*. . <br />WTR PUMP COST 16.88 WTR PUMP COST 19.63 <br />BACKUP OP COST BACKUP 1□P COST 0 <br />TOT BTU REQ 4.51E7 TOTAL HEAT CST 225.93 <br />OFF 1PK BTU REQ 6.31E6 <br />OFF 1PK HT COST 53.174 <br />TOTAL HEAT CST 194.25 <br />NOTE: THESE FIGURES ARE ESTIMATES ONLY. <br />TO UNPREDICTABLE CIRCUMSTANCES. <br />ACTUAL PERFORMANCE MAY VARY DUE <br />f' <br />. 0 Jb <br />^9 <br />Zi
The URL can be used to link to this page
Your browser does not support the video tag.