Laserfiche WebLink
LA23-000062 <br />January 16, 2024 <br />Page 2 of 6 <br /> <br />setback measurement of 107.6’ coupled with the required bluff setback of 30 feet from the top <br />of bluff create a very small building envelope making up about 10% of the entire lot size to be <br />considered buildable. <br /> <br />Planning Staff Practical Difficulty Analysis: Staff finds that the bluffs present on the property and <br />the required average lakeshore setback creates a limited building envelope. Staff is supportive <br />of the average lakeshore setback variance seeing that the proposal should not impact lake views <br />for the neighbor and they have submitted a letter of support. Furthermore, the proposed home <br />is located at a similar distance to the existing home and therefore not increasing the average <br />lakeshore setback encroachment. Staff recognizes that the existing home is nonconforming and <br />encroaching into the bluff. Due to the sensitive nature of the bluff, staff does not support any <br />portion of the new home to be located within the bluff setback. All other improvements such as <br />retaining walls, patios, and walkways are also prohibited from being located within the bluff <br />impact zone or bluff setback. Allowing these improvements would require grading and <br />construction activity in a protected area which is not permitted by the City Code. Staff <br />recognizes the need to access the property and can support a minimal driveway in the bluff <br />setback and impact zone, similar to what exists today. However, due to the sensitive nature of <br />the bluff and the numerous improvements within the bluff (highlighted in Exhibit J), bluff impact <br />zone, and bluff setback, the proposal as applied is not supported. The applicant’s choice of <br />home design, location and amenities lead to new encroachments within the bluff setback and <br />bluff impact zone and are out of convenience for a chosen home design. The applicant should <br />redesign the project to a new location or smaller footprint to meet the needs of the property. <br /> <br /> <br />LOT ANALYSIS WORKSHEET <br />Section 78-350– Setbacks: <br />DISTRICT LR-1B Required Existing Proposed <br />Rear (Street) 30’ 212’ 202’ <br />Side (East) 10’ 62’ 23.6’ <br />Lakeshore 75’ 95.6’ 95.7’ <br />Bluff Building Setback 30’ from Top of Bluff 18’ 28’ <br />Bluff Impact Zone 20’ from Top of Bluff 18’ 28’ <br />Average Lakeshore 107.6’ Not Met (95.6’) Not Met (95.7’) <br /> <br />Section 78-350 – Lot Area/Width: <br />DISTRICT LR-1B Lot Area Lot Width <br />Required 43,560 s.f. (1.0 acres) 140’ <br />Actual 65,801 (1.5 acre) 585’ @ 75’ / 705’ @ OHWL <br /> <br />Section 78-1403 – Structural Building Coverage: <br />Total Lot Area Total Structural Coverage <br />65,801 s.f. (1.5 acres) Allowed: 13,160.2 s.f. (20%) <br />Existing: 2,541 s.f. (3.9%) <br />Proposed: 4,555 s.f. (6.9%) <br /> <br /> <br /> <br />94