My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-16-2024 Planning Commission Packet
Orono
>
Planning Commission
>
2024
>
01-16-2024 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2024 1:20:44 PM
Creation date
1/17/2024 12:00:25 PM
Metadata
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
Katie Fitzsimmons
Created:
1/17/2024 12:10 PM
Modified:
1/17/2024 12:10 PM
Text:
PC Exhibit J
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />Pursuant to Minnesota Statutes Chapter 103D, and on the basis of statements and information <br />contained in the permit application, correspondence, plans, maps, and all other supporting data <br />submitted by the applicant, and made a part hereof by reference, PERMISSION IS HEREBY <br />GRANTED to the applicant named below for use and development of land in the Minnehaha <br />Creek Watershed District. <br /> <br /> <br /> <br />Issued: Travis and Sara Wildenberg Permit No: 23-310 <br /> <br />Location: 3838 Cherry Ave, Orono 55364 <br /> <br />Purpose: Erosion Control & Shoreline Stabilization – single-family home partial demolition and <br />new construction, existing riprap repair (Michael Paul Design Build) <br /> <br />Date of Issuance: 9/14/2023 Date of Expiration: 9/14/2024 <br /> <br /> By Order of the Board of Managers <br /> _____________________________ <br /> <br />Maria Friedges <br /> Permitting Technician <br /> <br />This permit is not transferable without District approval, and is valid to the date of expiration. No <br />activity is authorized beyond the expiration date. If the permittee requires more time to complete <br />the project, an application for renewal of the permit must be received by the District at least 30 <br />days before expiration. <br /> <br />The applicant is responsible for compliance with all District Rules and for the action of their <br />representatives, contractors, and employees. <br /> <br />Conditions: Project to be completed as described in plans submitted to the <br />MCWD office on July 17th, 2023 according to the provisions of this permit. <br />• Properly install and maintain all required erosion control measures until the <br />disturbed areas are re-stabilized <br />• Notify MCWD in writing upon completing installation of perimeter and <br />sedimentation controls <br />• When the site is re-stabilized and the MCWD staff has performed a final <br />inspection, all perimeter control must be removed <br /> <br />(Statement concerning fees for inspections, violations, etc... on following page) <br />53
The URL can be used to link to this page
Your browser does not support the video tag.