My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-21-1986 Planning Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
1980-1989
>
1986 Planning Packets
>
07-21-1986 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2024 12:36:45 PM
Creation date
1/17/2024 11:33:05 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ties <br />iot <br />. Comprehensive Plan Amendment <br />July 14, 1986 <br />Page 2 of 2 <br />” ' ^district^^^ approved for sewer service within the defined rural <br />°L property in relation to Alternative Waste Treatment <br />Methods (Required by CMP review CMP 6-44 [items 1 - 6] and exhibit D). <br />feasible nor practical for Fulmer to alter water use in the Kennel operation. <br />site evaluator, Steve Schirmers and Gaffron confirm that <br />system cannot be expanded nor a new system installed <br />V/ of the code nor with any assurance that such a <br />system will provide continuous service in the future. <br />® alternative.^ approved a composting or incinerative type system in <br />Ihl 1 system would not be effective with a high water user asthe kennel operation. <br />adequate maintenance of holding tanks not economically <br />feasible in light of the location of the interceptor <br />Tnc^« 1lines. The current system serving the house, <br />property^ already inadequate on this severely limited <br />6. The property is surrounded by large acred lots with no record of <br />septic problems. The property itself is bordered by railroad, Hwy. 12 <br />^^senger property to the east of the wetlands^is a <br />former dump/fill site and not suitable for septic systems. A <br />collection system and community or shared drainfield is not feasible. <br />Staff Reconendation - <br />kJ! ®PP^°y® City's application to amend the Municipal Comprehensive Plan <br />- boundaries within t'^he City to <br />serviceapproved by the M.W.C.C. for sewer <br />SinnetonL W V°" neighborhood. Windward and^ Boats Works properties on Shoreline Drive and the Crystal Bay <br />to approve new sewer connection for the residence and <br />commercial kennel at 3505 Wayzata Blvd. based on the following findings: <br />1. The extension of municipal sanitary sewer is (was) required because <br />environpental and or health problems could not be technically or <br />economically resolved on site. <br />2. The subject properties were all located adjacent to a M.W.C.C. interceptor . <br />3. The serving of these properties will not increase densities nor <br />open new areas for development because of such a sewer extension. <br />!L.^
The URL can be used to link to this page
Your browser does not support the video tag.