My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-16-1986 Planning Packet
Orono
>
Planning Commission
>
1986
>
06-16-1986 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2024 11:13:41 AM
Creation date
1/17/2024 11:09:44 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BonesUoo, Rosene, Anderlik & Associates, Inc. <br />itain <br />Log •• <br />2335 W. Trunk Highway 36 <br />$t. Paui, MN 55113 <br />612-636-4600 <br />June 11, 1986 <br />City o£ Orono <br />BOX 66 <br />Crystal Bay, MN 55323 <br />Attn: Jeanne Maybusth <br />Re; 139 - 1040 Ulrich <br />Dear Jeanne: <br />Engineers A Architects <br />Otto G. Ronesiroo, p. E, <br />Hubert W, Husenr, P.t\ <br />jMeph C. AndeHik, P.E. <br />Bradford A, Lemberg^ P,£. <br />Hichard £. Turner, P.E. <br />Jamei C. OUon, P.£, <br />Ctenn B. Cook. P.£. <br />ketth A. Cordon, P.E. <br />Thotruu E. Nuyt^, P.E. <br />Btckurd M'. Eoiter, P.E. <br />Hoberr C. Schuruchi, P.E. <br />Marvin L. Sorvala, P.E. <br />Donald C. Burgardt, P.E. <br />Jerry A. Bounton. P.E. <br />Mark A. Hanson, P.E, <br />Ted K. Field, P.E. <br />Mtcbael T. Hautmann, P.E. <br />Hubert H. PJeJfrrte. P.E. <br />David O. Loskota, P.E. <br />Thomas IT. Paterson, P.E. <br />MichaalC. Lynch, P.E. <br />Horan L. WUlis, P.E. <br />James B. Maland, P.E. <br />Kenneth P, Anderson, P.E. <br />Keith A. Bachmann, P.E. <br />Mara B. Bo(fs, P.E. <br />Bobert C. Bussek, A.LA. <br />Thomas E. Angus, P.E. <br />Sioit L. Young, P.E. <br />Charles A. Erkkson <br />Leo M. Pawalsky <br />Harlan M. Olson <br />Susan M. Eberltn <br />/ <br />[ i <br />We have reviewed the plans submitted on the Ulrich property for the seawall, <br />foundation drains and heat pump discharge. <br />The seawall plan should include the detail information submitted when the <br />existing wall was built. The certification by the engineer should not contain <br />the term "appears to be adequate". The Owner's engineer should check out the <br />design and certify that what is proposed meets standard design criteria. <br />» <br />The foundation drain plan should be modified to stop the drain field 10 feet <br />short of the lake shore. The drain tile should then be connected into a dis <br />tributor box and an overflow line provided. <br />The heat pump discharge line plan should provide the following additional <br />information: <br />* 1. Average discharge <br />2. Peak discharge <br />3. Velocity of water exiting holes in last pipe length <br />4. Method of anchoring Co lake bed <br />5. Improved profile information with station of point elevations indica <br />ted include station at lake shore <br />6. Well data'depth, size, capacity <br />7. Discharge temperature of water - summer and winter <br />The depth of the discharge line is shown approximately 5 feet below the normal <br />water elevation. Is this adequate clearance for boats which operate within <br />100 feet of the lake shore? The owner will also need a DNR permit for instal <br />lation of the discharge line in the lake bed. <br />5706d <br />Page 1, <br />30 Year <br />Anniversary
The URL can be used to link to this page
Your browser does not support the video tag.