Laserfiche WebLink
f.Evergreen Buffer:Consistent with Mrs. Hoppe's will the area <br />east of the parking lot to the boundary of the park will be <br />planted with evergreens to buffer the neighbor to the east. <br />The mass of plantings will also include other plant materials <br />to add color and texture of interest. <br />g.Memorial Arbor;The existing arbor should be removed and <br />replaced with one replicating the architectural style of the <br />house.Specifically, the memorial arbor should recall the <br />feeling of the porch and utilize the pillars salvaged when <br />the house was razed. <br />h.Gazebo;The boathouse/gazebo is being restored in 1985.The <br />top story will be a pleasant place to rest with panoramic <br />views of the Lake, formal garden, and the remainder of the <br />Estate. <br />i.Maintenance Services;A small work area and storage space is <br />provided as part of the visitor center building.The storage <br />of most maintenance equipment and large materials and <br />supplies will be in the main barn across County Road 51. <br />j.Irrigation System:The water distribution system will <br />require some improvement as the existing system is antiquated <br />and a maintenance problem.. <br />3.Capital Funding <br />Capital funding for the development of the Estate Garden will come <br />from several sources.Earnings from the funds given by Mrs. Hoppe <br />in excess of annual operating costs as well as principal in excess <br />of $1.? M will be used for development projects.In addition, the <br />District will seek contributions from individuals, organizations.