My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-27-1993 Council Packet
Orono
>
City Council
>
1993
>
09-27-1993 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2024 11:09:54 AM
Creation date
1/16/2024 11:06:02 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
333
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LMCCC - August 1993 Meeting <br />Page 2 <br />b) Production Report <br />O'Gorman gave a brief overview of things since he has taken over the position of <br />Production Coordinator. He stated that the Video Toaster is working great and has brought <br />the studio into a whole new production realm. It allows a huge variety of special effects <br />that enhances the end product immensely. <br />Production wise, all the shows are going well and production is up. The <br />are almost completed and he has high hopes for the graduates. <br />O'Gorman then thanked Jan Gray for filling in at the last minute for the <br />"Community Spotlight". <br />classes <br />program <br />c) Triax Report <br />Langley stated that there will be a phone interruption on Monday, August 23, 1993 <br />and "^jesday, August 24, 1993 due to the installation of a new and improved phone system. <br />Langley then stated that the Proof of Performance required by the FCC is in <br />progress and should be completed by August 26. 1993. <br />Chairman Salazar requested a change in Agenda moving item V.a) Video Program of the <br />Quarter Award. With no contest, he then presented the award to Zach Moos. Moos made a <br />brief statement of thanks to the Commission for allowing him the opportunity to produce. <br />IV. <br />a) <br />UNFINISHED BUSINFS <br />Status of South Shore Apartments (Excelsior) <br />Daniels stated that Triax has a signed agreement with South Shore <br />management. Langley concurred and stated it should be cabled later this fall. <br />Apartments' <br />b) Comroittee "rono Studio <br />Pattrin s’ '3d that after several meetings with Langley, several specific events <br />have or should ts^- place for the Orono studio. <br />* Triax received and accepted a letter of resignation from Brian Bergstrom, Orono <br />Community Education. Interviews for a studio manager replacement are underway This <br />position will be paid for by Triax and Orono Public Schools. <br />* Triax will promote the Orono studio access classes and production facilities. <br />* The studio will not be relocated to another building, however a larger space may <br />be provided. <br />* The equipment was inspected and evaluated by a Paragon Cable technician. There <br />was a problem with the portable studio cameras. However, Langley informed tiie Committee <br />that these will be replaced after the new studio manager is on board. <br />Pattrin then stated that the Committee is satisfied with these proposals, however, <br />it intends to closely watch the development in the northern area ' this franchise prior <br />to any other recommendations. He then commented that it is the Committee's hope that any <br />replacements are of finer quality than originals and that the studio lose the look of a <br />classroom. <br />Pattrin thanked Langley's promptness and coooeration in working on this problem. <br />V.NEW BUSINESS <br />Cl ission's Attorney, Tom Creighton, Reports on New FCC Rules <br />Salazar introduced Attorney Tom Creighton. <br />Creighton gave a brief history of his relationship with the LMCCC. He then stated <br />that he would be discussing the two main issues of Customer Service Standards and Rate <br />Regulations that Congress has implemented in the past year. <br />* Customer Service Standards - The FCC's objective was to set a minimum of <br />standards that cable companies must meet. Appendix B (attached) is the FCC outline of <br />these minimums. Creighton stated that he feels Triax currently meets these standards <br />however, a resolution mandating that they must meet these standards is required by the <br />FCC. The official resolution (attached) must state that the Commission will enforce the
The URL can be used to link to this page
Your browser does not support the video tag.