My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-27-1993 Council Packet
Orono
>
City Council
>
1993
>
09-27-1993 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2024 11:09:54 AM
Creation date
1/16/2024 11:06:02 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
333
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
C The Year Three Fhidnet refers to a single number not to be exceeded dollar amount which <br />will be used as the budget limit for the next calendar year in the event tiio Annual Budget <br />Package hxs not been ratified by all Contacting Cities by Octe^ber I of the second year of any <br />three year period covered by diis agreement. <br />D. Tl.e Annual Budget Packaee refers to the grouping of die Annual Operating Budget, the <br />Year Two Budget and the Year Three Budget which is submitted as a unit by the City of Long <br />Lake for ratification by the Contracting Cities. The Annual Budget P.ickage must be ratitieu <br />by all Contracting Cities prior to October 1 in the year submitted to become the valid budgets <br />for the following three years. The Annual Budget Package must be accepted or rejected in its <br />entirety. <br />8.2 Budget Process <br />By August 15 of each year during which this agreement remains in effect, the City ot Long <br />Lake will provide an Annual Budget Package covering the cost of fire protection for the next <br />three calendar year- ITie budgets presented to the Contracting cities must have been presented <br />to the Joint Advisory Committee prior to August 1 for discussion and review. Although it is <br />expected that the Annual Budget Package which is provided to the Contracting Cities by the <br />City of I.ong Lake will have the consensus support of the Joint Advisory Committee, that is <br />not a requirement since each Contracting City has the opportunity for f.nal ratification or <br />rejection. <br />9. Term of this Aereement. <br />Tliis Agreement is for three coivract years and covers the period January 1. 1994 through <br />December 31, 1996. A contract year covers the period January 1 through December 31 of a <br />calendar year. This Agreement will become effective upon ratification by the Contracting <br />Cities of all its parts including Appendix C which contains the initial Annual Budget Package. <br />The term of this agreement niay be e.xtended as described below. <br />9.1 On each occai.son that the Anuual Budget Package is ratified by October 1 by the <br />Contracting Cities, this Agreement will be renewed fer a total period of three contract year:, <br />beginning with the contract vear ft)llowing the current contract year. Ilie details of this process <br />are covered in sections 9.2 through 9.5 following. <br />9.2 When during the first contr.ict ye.u of any three yea: period covered by the Agreement the <br />Annual Budget Pack.ige is ratified by Contracting Cities by October 1. this Agreement shall be <br />extended by one contract year. When during the second contract year of any three year period <br />covered by the Agreement the Annual Budget Package is ratified by Contracting Cities by <br />October 1. this Agreement shall be extended by two contract years. When during the third <br />contract year of any three year period covered bv the Agreement tbe Annual Budget Package is <br />ratified by Contracting Cities by October 1. this Agreement sh.Ul be extended by three contract <br />years. The elements of the Annual Budget Package so ratified will replace the elements of the <br />prevhmsiy ratified Annual Budget Package. <br />9.3 W'hen during the first contract year of any three year period covered by the Agreement the <br />Annual Budget Package is not ratified by Contracting Cities by October 1. the amount
The URL can be used to link to this page
Your browser does not support the video tag.