Laserfiche WebLink
✓m -i>W <br />S K P R <br />-% • <br />» <br />»«• ^ <br />» • * Mill* V * ♦ <br />,srn.!4 »w I *i *»M •. <br />» •-, » N. f « W •. « <br />August 30. 1993 <br />SEP % 1S93 <br />Mr. Ron Moorse, City Administrator <br />City of Orono <br />PO Box 66 <br />Crystal Bay. MN 55323 <br />REF; Orono Municipal Public Works Building & Municipal Campus <br />RE:Fuel Dispensing System Provided by Pump & Meter Service Company <br />Work Order #101804. Invoice #74011 dated 6/30/93 <br />Dear Ron. <br />Today I met with Director of Public Works. John Gerhardson, to review the fuel dispensing equipment <br />installation provided under a separate contract by Pump & Meter Service Co., Inc. Included in the <br />workscope is a lube cube with a 4.000/2,000 gallon D/W concrete lined tank with Fill Rite 702 pumps (2 <br />plus a Tech 21 Model 1000 card reader). In addition to the above specified equipment, the Installation <br />includes a trench for electrical conduit, a supporting slab on grade (reinforced) with oollards at 4 foot <br />intervals, plus the set up of the 6,000 gallon A.G. compartmentalized vault tank. Installation also includes <br />the set up of pumps, a card reader and a light. Additionally, the Contractor will start up the system artd <br />give orientation to the Owners regarding the systems operations. The installation Is complete as per <br />Proposal 6800 provided by Pump & Meter Service Co.. 11303 Excelsior Blvd. Hopkins. MN 55343 to the <br />City of Orono <br />Based on Invoice #74011 to the City of Orono. dated 6/30/93. the installation final payment due Is for a <br />total of $51,129.75. This letter is to acknowledge that BKPR has reviewed the installation and the invoice <br />with John Gerhardson. and we recommend payment of the invoice arxJ billing as present^ by Pump & <br />Meter Service. The following is a list of items associated with the fuel distribution system installation, which <br />are noted as being punch list items for correction <br />Puntp & Meter Service Co. should anchor the tank enclosure (lube cube) to the slab onto <br />which it is mounted, unless they provide a letter stating why it Is not necessary. <br />The lube cube tank will require touch up painting to cover over holidays, skips and rusted <br />areas on the edges the tank <br />The Contractor shall seal all penetrations of control and power conduits going into the <br />control unit, or verify tfuil they already have uitegral weather seals Installed Inside of the <br />control unit <br />4. The City of Orono shaJ mount a fire extinguisher on a stand with *fire* markings to clearly <br />Indicate the location of a fire extinguisher. Note, the recommended area is inakle the <br />bollards at the fuel dispensMiy area <br />H \ K \t \ N K R r) o s I’ r 1 V T t K R I It I \\\ s s r I \ T I s <br />i'l Nuith S#<OBd • ViTf'eapoU* \ • »•’n p •> i .t • • • • i.t« <br />• a* • *»■ ♦ * *»• <br />\