Laserfiche WebLink
.4• -r <br />>9 <br />rt► .-r <br />' £■^mrVC ' ■ <br />b %f« * L* ,>*Vi'»’ <br />s® <br />its <br />m <br />fr *'•*' <br />I* V ',' ,» <br />.40 <br />5 a ■ ■> <br />h <br />■:r«- ? <br />'*n.* <br />'»♦•/-» \ • -4^ ui* \ <br />CJtv < <br />«/ <br />RESOLUTION OF THE CITV COUNCIL <br />NO 1'*- <br />V^'KivV’ <br />1. Prior to the hdvilin<j of fill to the site the applicant or <br />applicant's agent must stiUit.it the following: <br />a) Six cross sections of existing topography. <br />b) Final grading and Frosion Control plan designating the following: ^ <br />1) Side slopes "i: 1. <br />2) One percent : lope to be :naintained within inner fill <br />d rcd • <br />3) Silt fence inbtalled 3 0 to 3 5 feet from wetland at <br />972 elevation - no land alterations allowed within 26 <br />feet of wetland. <br />4) Average height of fill to be maintained at 5 feet. <br />5) Monitoring plates to be installed as required bv <br />the City Engineer. <br />c) Executed Developer's Agreement and appropriate security <br />to insure final grading and seeding if fill project is not <br />completed. Letter of Credit must be written for 150 percent <br />of the estimated cost of the improvement. <br />2. Fill shall not exceed allowed amount of 100,000 cubic yards. <br />Side slopes shall be seeded ?s soon as 5:1 slope ratio has boen <br />realized. <br />3. P.'tk Construction shall be responsible for advising the City <br />of monthly schedule of hauling activities so that staff can <br />arrange an approximate inspection schedule for each month. Prior <br />to hauling any fill to the site Park Construction must arrange <br />for a preconstruction meeting with the Orono staff to review all <br />final submittals and tentati/e hauling schedule. <br />4. Park Construct'on shall cease all hauling to the site upon <br />evidence of shearing and/or other signs of instability created by <br />Tilling over the former dump site. Applicant shall not proceed <br />with hauling until the City Engineer has had adequate time to <br />review the evidence and submit a written report to the Council <br />for their review and action. If Council determinea that it is in <br />the public interest to cease all hauling to the site, this <br />conditional use permit shall be terminated insnedlately and the <br />applicant ahall complete the final grading and seeding of the <br />entire disturbed area. <br />5. Authorities granted by this resolution run with the property <br />not with the owner, but are permissive only and muat be ''oeqileted <br />within one year of the date of Council approval or the spocial <br />conditions of this resolution will expire on that date (Juno S. <br />198S). ^ <br />Page 3 of 5 <br />’aTSuu'IS <br />-.ic" n► • f i