My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-13-1993 Council Packet
Orono
>
City Council
>
1993
>
09-13-1993 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2024 2:00:56 PM
Creation date
1/12/2024 1:57:43 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
313
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
•U *1 <br />f'.f' <br />^‘i <br />G. L. Contracting, Inc <br />4300 WiUow Dr., Medina, MN 55340 <br />Phone (612) 478-9529 • Fax (612)478-9592 <br />, 1 <br />- / <br />lulv 22. 1W3 <br />Jeanne Mabusth <br />Citv of Orono <br />RE: Application for Conditional Use Permit at 3245 U'ayzata IJIvd. <br />for Howard hisingcr, to place 70,000 cubic yards at an existing till site. <br />L)ear Ms. Mabu«<th; <br />This request is for a permit to receive conditional approval for the placement of additional <br />fill material at the existing site. <br />The new material will be coming from a joint project between the Minnehaha Creek VVSD <br />and the Citv of VVay/ata. The project is called the Gleason Creek Improvements - Basic <br />Water Management Project. The vvork includes the excavation of two large ponding and <br />edimentation baiiin;; to reduce flooding in the city. <br />The existing conditional permit for 20,000 cubic yards expires in October of 1**^, and has a <br />balance of 17,000 yard remaining from previous work. .Approximately 7000 cubic yards of <br />material will be placed in late luly and early August under the existing permit. I his <br />material will be coming from the ■-mailer. Lakeside pond. <br />The larger pond will be constructed through the fall and winter, resulting in approximately <br />50.000 cubic yards of fill material. 10,00 yards of this material will apply to the completion <br />of the existing permit <br />The material will be hauled to the site by' tandem and/or truck and trailer. The haul route <br />will be from Wayzata via Hwy. 12 through Long Lake to the fill '-ite. <br />We are requesting the citv approve the application for a period of two years, commencing at <br />the time of approval. Either the owner or the contractor will provide the oty with a letter <br />of credit for the project. <br />Should you have any que-^tions please contact me at your convenience <br />K«pectlully Submitted, <br />Clifford Reep <br />G.L. Contracting, Inc <br />Equal Opportunity Employer
The URL can be used to link to this page
Your browser does not support the video tag.