My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-13-1993 Council Packet
Orono
>
City Council
>
1993
>
09-13-1993 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2024 2:00:56 PM
Creation date
1/12/2024 1:57:43 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
313
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
the conditions set forth in Resolution ltl\91. The applicant never received fill <br />under this conditional use permit. <br />On April 13. 1992. the Orono Council approved Application #1722 granting a <br />permit to allow the filling of 10.000 cubic yards of clean fill per the same <br />conditions of the original resolution and repeated in Resolution #3108. The <br />10,000 cubic yards of fill were placed on the property. <br />8. <br />On October 26. 1992. the Orono Council approved Application #1766 granting <br />a ihiru conditional use permit to allow the filling of an additional 20,000 cubic <br />yards of clean fill, subject to the same conditions set forth in the previously <br />approval resolutions. <br />The applicant has met with staff, the City Engineer and a representative of the <br />Orono Police Department to review hauling route from the fill project in <br />Wayzata. and special conditions established by City for the hauling of fill to the <br />site. <br />I he 70,000 cubic yards of fill will result from a joint project between the <br />Minnehaha Creek Watershed District and the City of Wayz.ata referred to as the <br />Gleason Creek Improvements - Basic Water Management Project involving the <br />excavation of two large ponds and sedimentation basins to reduce flooding in the <br />City of Wayzau. Material will be hauled to the site by undem and'or truck and <br />trailer. The haul rou e will be from Wayzata vu Highway 12 through Long Lake <br />to the fill site. Hauling fill will commence some time in the fall of 1993. <br />On August 16. 1993. the OroiH) Planning Commission reviewed the current <br />appltcati«*n as proposed and recommcndcu unaninKnis approval of the conditional <br />use permii based on the following findings; <br />A. Current proposal resulting in a total of 100.000 cubic yards of fill will <br />have no negative impact on the sumninding wetlands or tiKeneettng <br />drainage ways. <br />U Adiaccrit property i*wners have been advised of the applicant % pr<»posal <br />Page 2 of 7
The URL can be used to link to this page
Your browser does not support the video tag.