My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-09-1993 Council Packet
Orono
>
City Council
>
1993
>
08-09-1993 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2024 9:59:42 AM
Creation date
1/9/2024 9:56:29 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
315
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
' cSo <br />c. <br />one year after the date of approval unless construction has commenced in accordance v-ith <br />the plan Ho>vever. if prior to the expiration of the approval, the applicant makes a written <br />request to the -{planning depwlmuit. dLpjHiiient o f eonmiuniiy ULietopinmt, zoning <br />administratorifor an extension of lime to commence construction setting forth the reasons <br />for the requested extension, the planning department may grant one extension of not greater <br />than one single year. Receipt of any request for an extension shall be acknowledged by the <br />I . ......irnnrtmrr* HAnart gimt rf ""^inmunitj dnTlnpmrnt. zoning administratorj^vithin <br />days zoning <br />adminSratorlshaTl in^cl decision on the extension within 30 days of receipt Any plan may <br />be revised in the same manner as originally approved. <br />Conditions. A storm water management plan may be approved subject to compliance with <br />conditions' reasonable and necessary to insure that the requirements contained in this <br />ordinance are met Such conditions may, among other matters, limit the size, kind or <br />character of the proposed development require the construction of structures, drainage <br />fadlities storage basins and other facilities, require replacement of vegetation, establish <br />required’ monitoring procedures, stage the work over time^reqmre altwation of th^site design <br />to insure buffering, and require the conveyance to the [City, Town, Qsunty) of or <br />other public entity of certain lands or interests therein. <br />Performance bond . Prior to approval of any storm water management plan, the applicant <br />shall submit an agreement to construct such required physical improvements, to dedicate <br />property or easements, or to comply with such conditions as may have been agreed to. Such <br />agreement shall be accompanied b> a bond to cover the amount of the established cost of <br />complying with the agreement. The agreement and bond shall guarantee completion and <br />compliance with conditions within a specific time, which time may be extended in accordance <br />with SeCfhni 7.2. <br />The adequacy, conditions and acceptability of any agreement and bond shall be determined <br />by the r>rr>l^ 4City Council, Teiin^ar d, Co unty -Boof d] o r any of ficial of the [City, <br />Touti. County] nf as may be designated by resolution of the [City <br />Council^ T\iWTrfio3Trfr'€ounty <br />a APPROVAL STANDARDS - HAV^ ^ <br />t No storm water management plan which fails to meet the standards contained in this section <br />shall be approved by ihe^City Council, Town Doard, County Board), • <br />[COMMENTARY: Sections 8.2 through S^Hare an^xtimple of how best management practice <br />for handling storm water runoff and design duf^for detention ponds can be included wuhm <br />an ordinance. Additional best managemeptpaCti^s and design criteria can be found tn the <br />MPCA publication 'Protecting Water Qemity in Urdan Areas.' <br />Site dewatering. Water pumped from the site shall be treated by temporary sedimentation <br />^' basins, grit chambers, sand filten, upfiow chambers, hydro-cyclones, swirl concentrators or <br />other appropriate controls as appropriate. Water may not be discharged in a manner that <br />causes erosion or flooding of the site or receiving channels or a wetland. <br />Waste and material disposal . All waste and umrsed bunding materials (including garbage, <br />debris, cleaning wastes, wastewater, toxic materials or hazardous materials) shall be proper y <br />disposed of off-site and not allowed to be carried by runoff into a receiving channel or storm <br />sewer system.
The URL can be used to link to this page
Your browser does not support the video tag.