My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-26-1993 Council Packet
Orono
>
City Council
>
1993
>
07-26-1993 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2024 1:02:53 PM
Creation date
1/8/2024 1:00:40 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
227
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
/ '> <br />TO: <br />FROM: <br />DATE: <br />Mayor and City Council <br />Ron Moorse, City Administrator <br />July 23, 1993 <br />SUBJECT: Sewer and Water Rate Study <br />Sewer Rates <br />\ <br />^ 'S' ^ <br />% V <br />:sewer Kaces <br />Sewer rates have not kept up with expenditure increas^^ (mainly <br />MWCC rates) for several years. Until 1992 interest earnings <br />enabled the sewer utility to operate without a loss. In 1992 the <br />com±)ination of increased MWCC rates, reduced interest earnings, and <br />a substantial unplanned sewer repair project caused the sewer fund <br />to operate at a deficit. The major cause of the increase in <br />expenditures is MWCC charges. These charges have increased from <br />$139,487 in 1991, to $191,481 in 1992, to $259,548 in 1993. In <br />addition tc the normal MWCC gallonage rate increases of <br />approximately 5% per year, the overall MWCC cost increase is due to <br />two major items. <br />1. An increase in flows as we have moved from a dry period to a <br />wet period beginning in 1990. <br />2. The impact of the wet years was delayed and then magnified <br />because of the MWCC's two year delay in reflecting the actual <br />flows. This delay results in credits when estimated flows are <br />higher than the actual flows, and results in debits when the <br />estimated flows are lower than the actual flows. As we <br />entered into 1990 we were receiving large credits from '88 and <br />89 due to the actual flows being significantly less than the <br />estimates. As the actual flows increased, their impact on <br />rates was tempered by these large credits; until- 1992 when the <br />credits ran out and the full impact of increased flows was <br />felt. The MWCC charges increased from $131,487 in 1991 to <br />$195,492 in 1992. <br />As we moved into 1991 and 1992, the MWCC flow estimates did <br />not keep up with the increase in flows, which caused actual <br />flows to be higher than estimated flows for these years. The <br />result is that in 1993 the City will experience a double <br />impact of the flow increase and a debit amount of $41,000. <br />This will cause a further increase in charges from $195,000 to <br />$259,000. This is a two year increase of $128,000 or *^8%. <br />These MWCC charges will continue at this level through at <br />least 1996 and possibly beyond if precipitation remains at its <br />high level. <br />In order to generate sufficient revenue to pay these higher <br />MWCC charges, and also to fund depreciation to build up a fund <br />for future system replacement, nd to continue a program of <br />upgrading the city's sewer lift stations; we need to determine <br />ways to increase revenues and reduce other expenses to match <br />the level of expenditures with the level of revenues. <br />Options for dealing with this gap between revenues and expenditures
The URL can be used to link to this page
Your browser does not support the video tag.